Message-ID: <25259366.1075863591271.JavaMail.evans@thyme> Date: Fri, 28 Jul 2000 09:35:00 -0700 (PDT) From: cgrant@caiso.com To: 20participants@caiso.com Subject: CAISO Notice - Posting of Additional Appendices to Support CMR Re commendation Cc: cmrcoreteam@caiso.com, cmrexecutivepolicyteam@caiso.com, cmrsteeringcommittee@caiso.com Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit Bcc: cmrcoreteam@caiso.com, cmrexecutivepolicyteam@caiso.com, cmrsteeringcommittee@caiso.com X-From: "Grant, Colleen" X-To: ISO Market Participants X-cc: CMR Core Team , CMR Executive Policy Team , CMR Steering Committee X-bcc: X-Folder: \Robert_Badeer_Aug2000\Notes Folders\All documents X-Origin: Badeer-R X-FileName: rbadeer.nsf Market Participants: The ISO has posted the following materials regarding CAISO's Congestion Management Reform (CMR) Recommendation. Congestion Management Reform Recommendation (This is the same as the version posted on July 11th with the exception that we have corrected typographical errors.) Appendix A - Terminology and Acronyms A glossary of various terms and acronyms used throughout the CMR Recommendation package. Appendix B - Locational Price Dispersion Study Summarizes the areas of empirical study in which the ISO is currently engaged and describes the objective, design, and preliminary results of the ISO's analysis of the dispersion of locational prices throughout the ISO control area. Appendix D - Assessment of CMR Design Recommendation with Respect to Stakeholder Evaluation Criteria Compares the CMR Recommendation against the specific evaluation criteria agreed to by the ISO and Market Participants at the first stakeholder meetings. Appendix E - Congestion Management Redesign Options Not Adopted in the CMR Recommendation Appendix G - System Impacts Summarizes the anticipated impact of CMR Recommendation on the ISO's primary systems, such as SI/SA, BBS, FTR, EMS, etc. The purpose of this appendix is not to provide detailed cost-benefit evaluation of the proposal, which we believe would be entirely subjective and of little value. Appendix H - Intra-Zonal Congestion Management Mitigation Costs During 1999 and Their Application to Local Reliability Areas. It is our intent to publicly distribute Appendix C, as identified below, by mid August. In the final draft of the recommendation package, to be publicly distributed and provided to the Board in late August, we will provide the following additional appendices as well as updated versions of those identified above. Appendix C - Market Separation Study The objectives, design, and preliminary results of the other ongoing study being undertaken in connection with the Congestion Management Reform process. Appendix F - Summary of Stakeholder Comments of California ISO Congestion Management Proposals A summary of all stakeholder comments received to date on the various proposals and concepts incorporated into this recommendation package. You can find these Appendices along with the original proposal and feedback form at http://www.caiso.com/clientserv/congestionreform.html. Byron Woertz Director, Client Relations