Message-ID: <14780697.1075853073635.JavaMail.evans@thyme> Date: Sun, 24 Jun 2001 13:25:00 -0700 (PDT) From: lynn.blair@enron.com To: joe.linhart@enron.com, john.buchanan@enron.com, gary.spraggins@enron.com, darrell.schoolcraft@enron.com, michael.bodnar@enron.com Subject: Maintenance Notes on El Paso, ANR, NOVA, and NGPL Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: quoted-printable X-From: Lynn Blair X-To: Joe Linhart , John Buchanan , Gary Spraggins , Darrell Schoolcraft , Michael Bodnar X-cc: X-bcc: X-Folder: \LBLAIR (Non-Privileged)\Blair, Lynn\Sent Items X-Origin: Blair-L X-FileName: LBLAIR (Non-Privileged).pst Joe, are you and Gary up to speed on this ElPaso outage on the 26th? Any concerns on our side? Thanks. Lynn ---------------------- Forwarded by Lynn Blair/ET&S/Enron on 06/24/2001 10:= 21 AM --------------------------- From:=09Lorna Brennan/ENRON@enronXgate on 06/22/2001 11:06 AM To:=09John Dushinske/ENRON@enronXgate, Bill Fowler/ENRON@enronXgate, Kent M= iller/ET&S/Enron@ENRON, Dave Neubauer/ET&S/Enron@ENRON, Sue Neville/ENRON@e= nronXgate, Jo Williams/ET&S/Enron@ENRON, Mike Barry/Enron@enronXgate, Vicki= Berg/ENRON@enronXgate, Sean Bolks/ENRON@enronXgate, Joni Bollinger/ENRON@e= nronXgate, Janet Bowers/ENRON@enronXgate, Theresa Branney/ENRON@enronXgate,= Craig Buehler/ENRON@enronXgate, Bob Burleson/Enron@enronXgate, Reyna Cabre= ra/ENRON@enronXgate, Lee Ferrell/ENRON@enronXgate, Stephen Herber/Enron@Enr= onXGate, Martha Janousek/ENRON@enronXgate, Tim Johanson/ENRON@enronXgate, J= ane Joyce/ENRON@enronXgate, Karen Lagerstrom/Enron@Enronxgate, Laura Lantef= ield/ENRON@enronXgate, Robert Mason/ENRON@enronXgate, Penny McCarran/Enron@= EnronXGate, Vernon Mercaldo/ENRON@enronXgate, Jeff Nielsen/ENRON@enronXgate= , Frank Oldenhuis/ENRON@enronXgate, Larry Pavlou/ENRON@enronXgate, Loren Pe= nkava/Enron@enronXgate, John Pritchard/ENRON@enronXgate, Preston Roobaert/E= NRON@enronXgate, Chris Sebesta/Enron@EnronXGate, Frank Semin/ENRON@enronXga= te, Michael G Stage/Enron@EnronXGate, Bob Stevens/ENRON@enronXgate, Larry S= wett/ENRON@enronXgate, Steve Thomas/ENRON@enronXgate, Kay Threet/ENRON@enro= nXgate, Lisa Valley/ENRON@enronXgate, Steve Weller/ENRON@enronxgate, Chuck = Wilkinson/ENRON@enronXgate, Lynn Blair/ET&S/Enron@ENRON, Rick Dietz/ENRON@e= nronXgate, Steven January/ENRON@enronXgate, Sheila Nacey/ET&S/Enron@ENRON, = Donna Scott/ENRON@enronXgate, Steven Harris/ET&S/Enron@ENRON, Lindy Donoho/= Enron@enronXgate, Jeffery Fawcett/ENRON@enronxgate, Pallavi Goradia/ENRON@e= nronXgate, Lorraine Lindberg/Enron@enronXgate, TK Lohman/ENRON@enronxgate, = Michelle Lokay/ENRON@enronXgate, Jan Moore/ENRON@enronXgate, Kimberly Watso= n/ENRON@enronXgate, Allen Cohrs/ENRON@enronXgate, John Fiscus/ENRON@enronxg= ate, Steve Gilbert/ENRON@enronxgate, Dana Jones/Enron@enronXgate, Stephanie= Korbelik/ENRON@enronxgate, Don Powell/ENRON@enronxgate, Ken Powers/ENRON@e= nronxgate cc:=09=20 Subject:=09Maintenance Notes on El Paso, ANR, NOVA, and NGPL Transportation Notes=20 Saying linepack had stabilized, El Paso canceled an Unauthorized Overpull P= enalty alert Wednesday, one day after it had gone into effect. The pipeline= also said it will take Line 1100 between the Eunice and Pecos River statio= ns down for repairs June 26. Six interconnects will be unable to deliver in= to El Paso that day, and the total flow of gas through Eunice Station to th= e South Mainline will be limited to 245 MMcf/d. Plants upstream of Eunice a= nd in the Monument area will compete for space with San Juan and Anadarko g= as moving south from Plains Station.=20 NOVA said it must reduce target linepack due to increasing soil and ambient= temperatures and to maintenance outages. It is seeking index-based uncondi= tional tenders through Tuesday for the firm sale of about 200,000 gigajoule= s. Tenders may be submitted for all or some of the reduction, which will be= accomplished through inventory transfers. The gas must be taken in more or= less even increments over a period of up to five days starting on or about= June 28, 2001. Call Darryn Rouillard at (403) 920-6341 for more informatio= n.=20 ANR plans to begin maintenance Monday at its Havensville Compressor Station= that will run through Oct. 15 and reduce Southwest Mainline capacity by ab= out 125 MMcf/d. However, based on current flow levels the impact of the wor= k should be minimal, ANR said.=20 Due to unexpected difficulties in operating the Bisti Station's #8 unit whi= le the C-1 turbine at the Chaco Plant in northwestern New Mexico is out of = service, flow from all wells in the GBISTI gathering system should remain s= hut in until turbine maintenance is complete, El Paso Field Services said. = The C-1 turbine is expected to return to service June 29. Operators must co= ntact Troy Chamberlain at (505) 564-4015, Corina Veloz at (505) 599-2357 or= the Control Center at (505) 599-2334 before turning wells back on.=20 El Paso said Wednesday evening its Guadalupe Station turbine and the #3 tur= bine at Pecos River Station #3 turbine had tripped offline unexpectedly. Th= e Guadalupe unit was returned to service quickly that evening, but attempts= to restart the Pecos River unit have been unsuccessful. Capacity through P= ecos River is limited to 840 MMcf/d until further notice.=20 NGPL reported discovery of a gas quality problem at the Transok-Bryan recei= pt point in Bryan County, OK. NGPL is working with Transok to resolve the p= roblem but said if it continues, NGPL may need to cut scheduled volumes at = the point.=20