Message-ID: <22265824.1075851896820.JavaMail.evans@thyme> Date: Thu, 18 May 2000 03:37:00 -0700 (PDT) From: larry.campbell@enron.com To: leo.nichols@enron.com Subject: Weekly Activity Report Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Larry Campbell X-To: Leo Nichols X-cc: X-bcc: X-Folder: \Larry_Campbell_Nov2001_1\Notes Folders\Discussion threads X-Origin: CAMPBELL-L X-FileName: lcampbe.nsf Another meeting was held with PG&E to discuss results of the latest sampling and construction activities on their system. DAta from sampling has shown that PCB's are steadily increasing into further portions of the PG&E system. The latest sampling results showed positive hits on their mainline system at MP 63.26 where 4 oz. of liquids were removed from a siphon. The analytical result of this liquid was 10 ppm. PG&E and Southwest Gas are continuing their internal sampling efforts to identifiy additional places within their systems where PCB's may collect and would be passed on to their customers. It should also be noted that PG&E is and will be continuing their efforts of installing small filter separators at strategic interconnects to protect and remove PCBs from entering customer and LDC lines. Annual emissions inventories were submitted to the TNRCC for the TW Walton and NNG Seminole and Plainview C/S's Title V air permits were receied from Region IX EPA for the Leupp and Klagetoh C/S's, which are on the Navajo Reservation. A roles and responsibilities meeting was held with the Flagstaff Team for the Leupp Title V permit. A meeting will be scheduled with the Gallup in the near future to assign roles and responsibilities for the Klagetoh permit. The Quarterly groundwater sampling has been completed at the NNG Gomez Plant. Semiannual groundwater sampling has been completed at the following Transwestern locations: C/S No. 5 Thoreau, North Crawar C/S. Semi annual groundwater sampling has been completed at the NNG Lockridge facility. Three additional groundwater monitoring wells will be installed at C/S No. 6, Laguna.