Message-ID: <11970746.1075851896936.JavaMail.evans@thyme> Date: Thu, 1 Jun 2000 03:47:00 -0700 (PDT) From: larry.campbell@enron.com To: leo.nichols@enron.com Subject: Weekly Activity Report-Roswell Area Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Larry Campbell X-To: Leo Nichols X-cc: X-bcc: X-Folder: \Larry_Campbell_Nov2001_1\Notes Folders\Discussion threads X-Origin: CAMPBELL-L X-FileName: lcampbe.nsf Received the "permit by rule" approval for the turbine power unit changeout for the Keystone C/S. The emissions testing results for the Plains Turbine Station was submitted to the TNRCC. Discharge renewal applications for C/S No. 9 and Monument Turbine C/S were submitted to the OCD. Notification to the New Mexico AQB was given for the power turbine changeout at the Atoka No. 2 C/S. One employee was skill verified for level II environmental During the routine weekly sampling of the PG&E system, it was discovered that approx. 3 oz of liquid had collected in the new filter separator in the PG&E C/S yard. A request was made to analyze the liquid for not only PCB's but also pH to determine if the liquids resulted from the caustic and water cleaning of the upstream portion of the pipe leading into the PG&E C/S . This is the first occurance of liquids at this location since this new filter separator was installed and put inot service.