Message-ID: <19412339.1075852933721.JavaMail.evans@thyme> Date: Tue, 17 Jul 2001 11:58:11 -0700 (PDT) From: krobb@hunton.com To: nyiso_tech_exchange@global2000.net Subject: Stage 2 Manual Add'l changes Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: "Robb, Kathy" X-To: 'nyiso_tech_exchange@global2000.net' X-cc: X-bcc: X-Folder: \LCAMPBEL (Non-Privileged)\Campbell, Larry F.\Inbox X-Origin: Campbell-L X-FileName: LCAMPBEL (Non-Privileged).pst Attached are a few changed pages of the Stage 2 ICAP Manual , to be approved at the July 19 BIC meeting. All these changes were made as result of ICAP Working Group deliberations over the past two weeks. They are summarized here: > Section 4.4.11 - This new sub-section addresses Generators that > temporarily may not wish to sell or certify their UCAP. Without this > language, those Generators would have been considered forced out. > > Section 4.6 - The second paragraph is new and clarifies the result of > outages which occur beyond the step-up transformer, and including such > step-up transformer. If these outages occur at a time when a Generator > has not placed its unit on a maintenance outage, such interruption in > availability shall be treated as a reserve shutdown for purposes of > calculating that Generator's EFORD. > > Section 5.5 - Language describing the roll-over characteristics of UCAP > bids from the first phase of an auction to the second phase of that same > auction has been struck because the ICAPWG deemed it confusing. > > In addition, a motion for approval of the Stage 2 ICAP Manual, including these additional changes, is attached. If you have questions, please contact John Charlton at the NYISO, Howard Fromer, chair of the ICAPWG, or me. Kathy Robb Hunton & Williams krobb@hunton.com 212.309.1128 > <> > > <<4.4.11_Red.pdf>> <<4.6.2_Red.pdf>> <<5.5_(red).PDF>> > > - BIC Motion to approve Stage 2 Manual(v5).pdf - 4.4.11_Red.pdf - 4.6.2_Red.pdf - 5.5_(red).PDF