Message-ID: <7659164.1075851913788.JavaMail.evans@thyme> Date: Thu, 17 Aug 2000 02:54:00 -0700 (PDT) From: john.shafer@enron.com To: michel.nelson@enron.com, dave.odneal@enron.com, louis.soldano@enron.com, david.roensch@enron.com, rich.jolly@enron.com, larry.campbell@enron.com, earl.chanley@enron.com, steven.harris@enron.com Subject: Proposed Topock Separator - September 11/12 Cc: phil.lowry@enron.com, michael.terraso@enron.com Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit Bcc: phil.lowry@enron.com, michael.terraso@enron.com X-From: John Shafer X-To: Michel Nelson, Dave Odneal, Louis Soldano, David Roensch, Rich Jolly, Larry Campbell, Earl Chanley, Steven Harris X-cc: Phil Lowry, Michael Terraso X-bcc: X-Folder: \Larry_Campbell_Nov2001_1\Notes Folders\Pg&e meetings and notes X-Origin: CAMPBELL-L X-FileName: lcampbe.nsf I will be holding a conference call today at 11:00 AM (Central time) for the purpose of relating some information I have received from Rod Boshcee of PG&E. The conference number is 1-800-991-9019, passcode 6000796. Rod left a very friendly detailed message on my voice mail yesterday afternoon related to the upcoming proposed shutdown and testing of the separators at Topock (which they previously agreed would be done around September 11 or 12. He asked on the voice mail that I give him a call back and let him know what our decision is as soon as possible. The following will attempt to summarize his voice mail message and will be the subject of our call today: Rod stated that when we were together at Flagstaff in July we had decided to again take the system down and sample the separators around September 11 and 12. He said PG&E has continued to monitor their unit and have found nothing new since the June 29 test. Rod also said that they have gotten consistent numbers downstream since June 29 and everything seems stabilized. He said that PG&E is "happy" with the operation of the separators and they seem to be doing the job that TW had said they would do. Rod said that PG&E would go along with TW's thoughts on it, but they were wondering if it was really necessary to take the system down in mid-September or not since things were looking good? He said they could go either way on it. Rod closed by saying that they still had some concern about the sterility of the 1800' of pipe that connects TW's Meter Run with PG&E's Topock Compressor Station. However, it seemed to be OK for now and they would have no other thoughts on it as long as the numbers stay consistently low on their side. He asked that we let him know what we want to do as soon as possible so scheduling will not be a problem. I would propose that we discuss this matter and then we can call him back and furnish our recommendation. The cooperative tone of his call is something we want to continue to build upon and I do want us to be promptly responsive in that regard. Thanks, John