Message-ID: <8912954.1075851915581.JavaMail.evans@thyme> Date: Thu, 15 Feb 2001 01:56:00 -0800 (PST) From: arnold.eisenstein@enron.com To: larry.campbell@enron.com Subject: Re: loading range of the RB211 Cc: earl.chanley@enron.com Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit Bcc: earl.chanley@enron.com X-From: Arnold L Eisenstein X-To: Larry Campbell X-cc: Earl Chanley X-bcc: X-Folder: \Larry_Campbell_Nov2001_1\Notes Folders\Redrock mainline expansion X-Origin: CAMPBELL-L X-FileName: lcampbe.nsf You will need this!! confirming our conversation......reserve emissions for a nom 350KW (gas if prime - diesel if standby) gen set at each site Larry Campbell@ENRON 02/14/2001 05:30 PM To: Arnold L Eisenstein/ENRON_DEVELOPMENT@ENRON_DEVELOPMENT cc: Earl Chanley/ET&S/Enron@Enron Subject: Re: loading range of the RB211 Arnold, to be safe Im going to permit at 50-100%. that should be conservative and allow for minor excursions..... To: Larry Campbell/ET&S/Enron@ENRON cc: Earl Chanley/ET&S/Enron@Enron Subject: Re: loading range of the RB211 normal guarentees are from 50% to 100% load at site rated conditions. we will probably require 40% for these units and make some mods to the control system, still determining requirements Arnold Larry Campbell@ENRON 02/14/2001 04:30 PM To: Earl Chanley/ET&S/Enron@Enron, Arnold L Eisenstein/ENRON_DEVELOPMENT@ENRON_DEVELOPMENT cc: Subject: loading range of the RB211 Guys, emissions guarantees are in part calculated upon loading range of the turbines. In order to get an accurate emissions number for each of the four locations, would you please provide to me the "loading range" of the turbines at each of their respective locations? thanx very much