Message-ID: <23424336.1075857371004.JavaMail.evans@thyme> Date: Mon, 7 May 2001 10:14:00 -0700 (PDT) From: eileen.ogrady@dowjones.com To: eileen.ogrady@dowjones.com Subject: FYI: Ercot Export Capacity Back To Normal Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: "O'Grady, Eileen" X-To: "O'Grady, Eileen" X-cc: X-bcc: X-Folder: \Clint_Dean_Jun2001\Notes Folders\Notes inbox X-Origin: Dean-C X-FileName: cdean.nsf DJ Texas Power Export Capacity Returns To Normal HOUSTON (Dow Jones)--Southwestern Electric Power Co. confirmed Monday that a breaker problem near the 600-megawatt eastern direct-current tie has been repaired, allowing exports from Texas to return to normal. The breaker problem, which began last month at the coal-fired Welsh plant in Cason, Texas, could have lasted all summer, the utility had warned the Independent System Operator for the Electric Reliability Council of Texas. The breaker problem had limited exports by 100 MW from Ercot into the adjacent Southwest Power Pool. SWEPCO is a unit of American Electric Power (AEP). The east DC tie connects the transmission network of TXU Electric and SWEPCO. The east DC tie is the larger of two devices in the state, which allow a combined 800 MW of power to be imported or exported from Ercot to SPP. Ercot's northern DC tie, which connects the West Texas Utilities Co. system to Public Service Co. of Oklahoma, is rated at 220 MW. -By Eileen O'Grady, Dow Jones Newswires; 713-547-9213; eileen.ogrady@dowjones.com (END) Dow Jones Newswires 07-05-01 2058GMT (AP-DJ-05-07-01 2058GMT) :TICKER: AEP :SUBJECT: EUTL DI1 DI4 STMG OH TX Copyright (c) 2001 Dow Jones and Company, Inc. Received by NewsEDGE/LAN: 5/7/01 4:04 PM