Message-ID: <22213375.1075855475218.JavaMail.evans@thyme> Date: Fri, 10 Nov 2000 09:29:00 -0800 (PST) From: enron.announcements@enron.com To: houston.report@enron.com Subject: SUPPLEMENTAL Weekend Outage Report for 11-10-00 Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Enron Announcements X-To: Houston Outage Report X-cc: X-bcc: X-Folder: \Frank_Ermis_Dec2000\Notes Folders\All documents X-Origin: Ermis-F X-FileName: fermis.nsf ------------------------------------------------------------------------------ ------------------------ W E E K E N D S Y S T E M S A V A I L A B I L I T Y F O R November 10, 2000 5:00pm through November 13, 2000 12:00am ------------------------------------------------------------------------------ ------------------------ SCHEDULED SYSTEM OUTAGES: ARDMORE DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages. AZURIX: No Scheduled Outages. EB34 DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages. EDI SERVER: POSTPONED Impact: EDI Time: Sat 11/11/2000 at 11:00:00 PM CT thru Sun 11/12/2000 at 1:00:00 AM CT Sat 11/11/2000 at 9:00:00 PM PT thru Sat 11/11/2000 at 11:00:00 PM PT Sun 11/12/2000 at 5:00:00AM London thru Sun 11/12/2000 at 7:00:00 AM London Outage: EDI HUB DISK VOLUME INCREASE Environments Impacted: Corporate Purpose: Continued EDI volume increases require the addition of more disk space for EDI operations. Backout: Utilize current configuration w/o new HACMP configuration Contact(s): Jack Metkus Jim Nelson 3-7799 713-327-2007 Karen O'Grady 5-7149 713-327-4805 Jack Metkus 3-0362 713-288-0743 EI: SEE ORIGINAL REPORT ENRON NORTH AMERICAN LANS: No Scheduled Outages. FIELD SERVICES: No Scheduled Outages. INTERNET: ALSO SEE ORIGINAL REPORT Impact: eol Time: Fri 11/10/2000 at 6:00:00 PM CT thru Fri 11/10/2000 at 7:00:00 PM CT Fri 11/10/2000 at 4:00:00 PM PT thru Fri 11/10/2000 at 5:00:00 PM PT Sat 11/11/2000 at 12:00:00 AM London thru Sat 11/11/2000 at 1:00:00 AM London Outage: eol net change Environments Impacted: EOl Purpose: We have found that IP multicast storms on the EOL internal subnet 172.16.21.0 briefly incapacitate the EOL firewall eolfw1. To solve the problem, we will insert a new VLAN/subnet 172.16.23.0 between 172.16.21.0 and the firewall so that no IP multicast traffic will reach the firewall interface. Physical work includes running two copper cables from trd-cx[12]-3405 port 6/7 to eolfw1 and logical work entails defining the new VLAN on the switches/routers, enabling interface vlan23 and changing ip route 192.216.56.0 255.255.255.0 172.16.21.4 ip route 192.216.57.0 255.255.255.0 172.16.21.4 to ip route 192.216.56.0 255.255.255.0 172.16.23.4 ip route 192.216.57.0 255.255.255.0 172.16.23.4 on the routers, and replacing route inside 10.0.0.0 255.0.0.0 172.16.21.1 1 route inside 172.16.0.0 255.242.0.0 172.16.21.1 1 route inside 192.168.0.0 255.255.0.0 172.16.21.1 1 with route inside 10.0.0.0 255.0.0.0 172.16.23.1 1 route inside 172.16.0.0 255.242.0.0 172.16.23.1 1 route inside 192.168.0.0 255.255.0.0 172.16.23.1 1 on eolfw1. Backout: Contact(s): Anchi Zhang 713-853-5464 LOTUS NOTES: No Scheduled Outages. MARKET DATA: No Scheduled Outages. NT: No Scheduled Outages. OS/2: No Scheduled Outages. OTHER SYSTEMS: ALSO SEE ORIGINAL REPORT Impact: CORP Time: Sat 11/11/2000 at 8:30:00 AM Buenos Aires thru Sat 11/11/2000 at 5:00:00 PM Buenos Aires Sat 11/11/2000 at 5:30:00 AM CT thru Sat 11/11/2000 at 2:00:00 PM CT Sat 11/11/2000 at 3:30:00 AM PT thru Sat 11/11/2000 at 12:00:00 PM PT Sat 11/11/2000 at 11:30:00 AM London thru Sat 11/11/2000 at 8:00:00 PM London Outage: Maintenance electricity Environments Impacted: ESA - Buenos Aires Purpose: Electrical security Backout: Back to the original project. Contact(s): Ariel Bruch Nilson Busto 55-11-5503-1347 office 55-11-9233-7481 cel Impact: ESA Time: Sun 11/12/2000 at 2:30:00 PM Brazil thru Sun 11/12/2000 at 6:00:00 PM Brazil Sun 11/12/2000 at 10:30:00 AM CT thru Sun 11/12/2000 at 2:00:00 PM CT Sun 11/12/2000 at 8:30:00 AM PT thru Sun 11/12/2000 at 12:00:00 PM PT Sun 11/12/2000 at 4:30:00 PM London thru Sun 11/12/2000 at 8:00:00 PM London Outage: Maintenance to the electrical systems Environments Impacted: Sao Paulo Office Purpose: Security maintenance Backout: Back to the original project. Contact(s): Nilson Busto 55-11-5503-1347 office 55-11-9233-7481 cel SITARA: No Scheduled Outages. SUN/OSS SYSTEM: No Scheduled Outages. TELEPHONY: SEE ORIGINAL REPORT TERMINAL SERVER: No Scheduled Outages. UNIFY: Impact: CORP Time: Fri 11/10/2000 at 6:00:00 PM CT thru Sat 11/11/2000 at 8:15:00 AM CT Fri 11/10/2000 at 4:00:00 PM PT thru Sat 11/11/2000 at 6:15:00 AM PT Sat 11/11/2000 at 12:00:00 AM London thru Sat 11/11/2000 at 2:15:00 PM London Outage: Unify Environments Impacted: Unify Users Purpose: For better I/O performance Backout: Restore the database with the backup Contact(s): Jaikishore Bharathi 713-853-0347 ------------------------------------------------------------------------------ ------------------------------------------------------- FOR ASSISTANCE (713) 853-1411 Enron Resolution Center (713) 853-5536 Information Risk Management Specific Applications Help: Unify On-Call (713) 284-3757 [Pager] Sitara On-Call (713) 288-0101 [Pager] RUS/GOPS/GeoTools/APRS (713) 639-9726 [Pager] OSS/UA4/TARP (713) 285-3165 [Pager] CPR (713) 284-4175 [Pager] EDI Support (713) 327-3893 [Pager] All Other Systems (713) 563-5797 [Pager] or (713) 563-5987 [Pager]