Message-ID: <24192949.1075855475449.JavaMail.evans@thyme> Date: Thu, 9 Nov 2000 10:03:00 -0800 (PST) From: enron.announcements@enron.com To: houston.report@enron.com Subject: Weekend Outage for 11-10-00 through 11-13-00 Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Enron Announcements X-To: Houston Outage Report X-cc: X-bcc: X-Folder: \Frank_Ermis_Dec2000\Notes Folders\All documents X-Origin: Ermis-F X-FileName: fermis.nsf ------------------------------------------------------------------------------ ------------------------ W E E K E N D S Y S T E M S A V A I L A B I L I T Y F O R November 10, 2000 5:00pm through November 13, 2000 12:00am ------------------------------------------------------------------------------ ------------------------ SCHEDULED SYSTEM OUTAGES: ARDMORE DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages. AZURIX: No Scheduled Outages. EB34 DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages. EDI SERVER: Impact: EDI Time: Sat 11/11/2000 at 11:00:00 PM CT thru Sun 11/12/2000 at 1:00:00 AM CT Sat 11/11/2000 at 9:00:00 PM PT thru Sat 11/11/2000 at 11:00:00 PM PT Sun 11/12/2000 at 5:00:00AM London thru Sun 11/12/2000 at 7:00:00 AM London Outage: EDI HUB DISK VOLUME INCREASE Environments Impacted: Corporate Purpose: Continued EDI volume increases require the addition of more disk space for EDI operations. Backout: Utilize current configuration w/o new HACMP configuration Contact(s): Jack Metkus Jim Nelson 3-7799 713-327-2007 Karen O'Grady 5-7149 713-327-4805 Jack Metkus 3-0362 713-288-0743 EI: Impact: EI Time: Sat 11/11/2000 at 8:00:00 PM CT thru Sat 11/11/2000 at 10:00:00 PM CT Sat 11/11/2000 at 6:00:00 PM PT thru Sat 11/11/2000 at 8:00:00 PM PT Sun 11/12/2000 at 2:00:00 AM London thru Sun 11/12/2000 at 4:00:00 AM London Outage: EI Load Balancing Environments Impacted: El Purpose: to stabilize the EI environment Backout: back to 5000's Contact(s): Steve Hardy 713-853-9294 713-415-0672 ENRON NORTH AMERICAN LANS: No Scheduled Outages. FIELD SERVICES: No Scheduled Outages. INTERNET: Impact: ENE Internet Time: Sat 11/11/2000 at 11:00:00 PM CT thru Sun 11/12/2000 at 12:00:00 AM CT Sat 11/11/2000 at 9:00:00 PM PT thru Sat 11/11/2000 at 10:00:00 PM PT Sun 11/12/2000 at 5:00:00 AM London thru Sun 11/12/2000 at 6:00:00 AM London Outage: reboot ene net devices Environments Impacted: Internet Purpose: regular reboot to prevent such problems as memory corruption Backout: Contact(s): Bryan Aubuchon 713-345-8446 LOTUS NOTES: No Scheduled Outages. MARKET DATA: No Scheduled Outages. NT: No Scheduled Outages. OS/2: No Scheduled Outages. OTHER SYSTEMS: Impact: CSC Time: Fri 11/10/2000 at 5:00:00 PM CT thru Fri 11/10/2000 at 6:00:00 PM CT Fri 11/10/2000 at 3:00:00 PM PT thru Fri 11/10/2000 at 4:00:00 PM PT Fri 11/10/2000 at 11:00:00 PM London thru Sat 11/11/2000 at 12:00:00 AM London Outage: Initial "hardening" of cscfw1 Environments Impacted: CSC Purpose: To maintain a secure and efficient configuration Backout: Apply old configuration Contact(s): Jon Werner 713-853-6742 Impact: TDS Time: Sat 11/11/2000 at 12:30:00 PM CT thru Sat 11/11/2000 at 5:30:00 PM CT Sat 11/11/2000 at 10:30:00 AM PT thru Sat 11/11/2000 at 3:30:00 PM PT Sat 11/11/2000 at 6:30:00 PM London thru Sat 11/11/2000 at 11:30:00 PM London Outage: TDSPROD Upgrade from 7.3.4 to 8i Environments Impacted: OASIS, Cooper, PDS Purpose: In order to utilize new features available in Oracle 8i. Backout: If the upgrade fails, then a full databse refresh from the most recent backup will be performed. Contact(s): Neil Leininger 713-345-3518 SITARA: No Scheduled Outages. SUN/OSS SYSTEM: No Scheduled Outages. TELEPHONY: Impact: EIS Time: Fri 11/10/2000 at 11:00:00 PM CT thru Sat 11/11/2000 at 1:00:00 AM CT Fri 11/10/2000 at 9:00:00 PM PT thru Fri 11/11/2000 at 11:00:00 PM PT Sat 11/11/2000 at 5:00:00 AM London thru Sat 11/11/2000 at 7:00 AM London Outage: Scheduled CMS & Conversant Attended Backup and Intuity Audix reboot. Environments Impacted: Purpose: Monthly maintenance Backout: rebooting system only, no back out plan. Contact(s): Epimenio Rojas 713-345-8372 Impact: EIS Time: Fri 11/10/2000 at 11:00:00 PM CT thru Sat 11/11/2000 at 1:30:00 AM CT Fri 11/10/2000 at 9:00:00 PM PT thru Fri 11/10/2000 at 11:30:00 PM PT Sat 11/11/2000 at 5:00:00 AM London thru Sat 11/11/2000 at 7:30:00 AM London Outage: Quarterly Maintenance - Telephone Ancillary Equipment Environments Impacted: All Purpose: Quarterly Maintenance Backout: none Contact(s): Cynthia Siniard 713-853-0558 TERMINAL SERVER: No Scheduled Outages. UNIFY: No Scheduled Outages. ------------------------------------------------------------------------------ ------------------------------------------------------- FOR ASSISTANCE (713) 853-1411 Enron Resolution Center (713) 853-5536 Information Risk Management Specific Applications Help: Unify On-Call (713) 284-3757 [Pager] Sitara On-Call (713) 288-0101 [Pager] RUS/GOPS/GeoTools/APRS (713) 639-9726 [Pager] OSS/UA4/TARP (713) 285-3165 [Pager] CPR (713) 284-4175 [Pager] EDI Support (713) 327-3893 [Pager] All Other Systems (713) 563-5797 [Pager] or (713) 563-5987 [Pager]