Message-ID: <6959469.1075855489444.JavaMail.evans@thyme> Date: Fri, 4 May 2001 01:33:00 -0700 (PDT) From: enron.announcements@enron.com To: houston.report@enron.com Subject: Weekend Outage Report for 5-4-01 through 5-7-01 Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Enron Announcements X-To: Houston Outage Report X-cc: X-bcc: X-Folder: \Frank_Ermis_Jun2001\Notes Folders\All documents X-Origin: Ermis-F X-FileName: fermis.nsf ------------------------------------------------------------------------------ ------------------------ W E E K E N D S Y S T E M S A V A I L A B I L I T Y F O R May 4, 2001 5:00pm through May 7, 2001 12:00am ------------------------------------------------------------------------------ ------------------------ SCHEDULED SYSTEM OUTAGES: ARDMORE DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages. AZURIX: No Scheduled Outages. EB34 DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages. EDI SERVER: No Scheduled Outages. ENRON CENTER SOUTH DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages ENRON NORTH AMERICAN LANS: Impact: ENS Time: Fri 5/4/2001 at 9:00:00 PM CT thru Fri 5/4/2001 at 10:00:00 PM CT Fri 5/4/2001 at 7:00:00 PM PT thru Fri 5/4/2001 at 8:00:00 PM PT Sat 5/5/2001 at 3:00:00 AM London thru Sat 5/5/2001 at 4:00:00 AM London Outage: Consolidation Of Networks Environments Impacted: ENA Purpose: Consolidating Network Equipment. Moving networks 172.16.48.20, 172.16.136.20, 172.16.51.20, and 172.16.194.20 from 3460 to 3405. Backout: Contact(s): George Nguyen 713-853-0691 Impact: CORP Time: Sat 5/5/2001 at 1:00:00 PM CT thru Sat 5/5/2001 at 7:15:00 PM CT Sat 5/5/2001 at 11:00:00 AM PT thru Sat 5/5/2001 at 5:15:00 PM PT Sat 5/5/2001 at 7:00:00 PM London thru Sun 5/6/2001 at 1:15:00 AM London Outage: Migrating EES VLANs from EB3405-cx11 and EB3405-cx12 to EB3405-cx13 and EB3405-cx14 Environments Impacted: EES Purpose: Off-load CPU usage onto current EB3405-CX13 and EB3405-CX14; increase throughput and redundancy. Backout: Remove EB3405-CX13 and EB3405-CX14. Replace original access-links connecting HOUCX1 and HOUCX2 back to EB3405-CX11 and EB3405-CX12. Contact(s): Michael Huang 713-875-2478 877-692-2751 Impact: ENS Time: Fri 5/4/2001 at 10:30:00 PM CT thru Sat 5/5/2001 at 12:00:00 AM CT Fri 5/4/2001 at 8:30:00 PM PT thru Fri 5/4/2001 at 10:00:00 PM PT Sat 5/5/2001 at 4:30:00 AM London thru Sat 5/5/2001 at 6:00:00 AM London Outage: Migrating Networks Off Cisco 3 and Cisco 4 Environments Impacted: ENA Purpose: Migration of Networks Off Legacy Cisco Boxes Backout: Contact(s): George Nguyen 713-853-0691 FIELD SERVICES: No Scheduled Outages. INTERNET: No Scheduled Outages. MESSAGING: Impact: Corp Notes Time: Fri 5/4/2001 at 9:00:00 PM CT thru Sat 5/5/2001 at 1:00:00 AM CT Fri 5/4/2001 at 7:00:00 PM PT thru Fri 5/4/2001 at 11:00:00 PM PT Sat 5/5/2001 at 3:00:00 AM London thru Sat 5/5/2001 at 7:00:00 AM London Outage: cNotes Server Reboots Environments Impacted: All users on any of the mailservers listed below Purpose: Scheduled @ 2 week interval Backout: Make sure server comes up. Contact(s): Trey Rhodes (713) 345-7792 Impact: EI Time: Fri 5/4/2001 at 9:00:00 PM CT thru Sat 5/5/2001 at 1:00:00 AM CT Fri 5/4/2001 at 7:00:00 PM PT thru Fri 5/4/2001 at 11:00:00 PM PT Sat 5/5/2001 at 3:00:00 AM London thru Sat 5/5/2001 at 7:00:00 AM London Outage: EI Notes Server Maintenance Environments Impacted: EI Local/Domestic/Foreign Sites Purpose: Scheduled @ 2 week interval Backout: N/A Contact(s): David Ricafrente 713-646-7741 MARKET DATA: No Scheduled Outages. NT: No Scheduled Outages. OS/2: No Scheduled Outages. OTHER SYSTEMS: Impact: Corp, OTS, ETS DATE: MAY 15, 2001/2/2001 at 5:30:00 PM Outage: Migrate DSS Server to GTHOU-APPSQ03P Environments Impacted: DSS users will not be able to access the old server (ENEDS01_ADAPT)after this date Purpose: The existing server is outdated, migrating to SQL 2000 provides increased functionality and conforms to database platform requirements. Backout: Contact(s): Mary Vollmer 713-853-3381 Joe Hellsten 713-853-7346 713-545-4164 Impact: EBS Time: Fri 5/4/2001 at 8:00:00 PM CT thru Fri 5/4/2001 at 10:00:00 PM CT Fri 5/4/2001 at 6:00:00 PM PT thru Fri 5/4/2001 at 8:00:00 PM PT Sat 5/5/2001 at 2:00:00 AM London thru Sat 5/5/2001 at 4:00:00 AM London Outage: EIGRP Integration - EBS and ENW Environments Impacted: All Purpose: The EBS network is being integrated into the ENW network. As part of the integration, we will need to bring up EIGRP process 5 on the EBS networking devices. This is the first step in the routing integration. Since ENW is already static routing 10.0.0.0/8 to EBS and EBS is static routing 172.16.0.0/12 and 192.168.0.0/16 to ENW, the impact should be nil. Backout: Remove eigrp process 5 from iah-ecn44-rtr3.enron.net Contact(s): Dennis McGough 713-345-3143 Scott Shishido 713-853-9780 Impact: CORP Time: Sat 5/5/2001 at 12:00:00 AM CT thru Sat 5/5/2001 at 1:00:00 AM CT Fri 5/4/2001 at 10:00:00 PM PT thru Fri 5/5/2001 at 11:00:00 PM PT Sat 5/5/2001 at 6:00:00 AM London thru Sat 5/5/2001 at 7:00:00 AM London Outage: Elvis webserver maintenance. Environments Impacted: Internet Web pages. Purpose: Physically stabilize the server in the rack. Backout: Leave server on shelf unracked reboot the server Contact(s): Malcolm Wells 713-345-3716 Impact: CORP Time: Fri 5/4/2001 at 6:00:00 PM CT thru Fri 5/4/2001 at 8:00:00 PM CT Fri 5/4/2001 at 4:00:00 PM PT thru Fri 5/4/2001 at 6:00:00 PM PT Sat 5/5/2001 at 12:00:00 AM London thru Sat 5/5/2001 at 2:00:00 AM London Outage: ClearCase Patch Environments Impacted: Corp Purpose: This patch will resolve several issues involving the MVFS (ClearCase file system.) Backout: Remove the patch Contact(s): Troy Beyer 713.345.8316 713.406.1782 SITARA: No Scheduled Outages. SUN/OSS SYSTEM: No Scheduled Outages. TELEPHONY: No Scheduled Outages TERMINAL SERVER: No Scheduled Outages. UNIFY: No Scheduled Outages. ------------------------------------------------------------------------------ ----------------------------------------------- FOR ASSISTANCE (713) 853-1411 Enron Resolution Center Specific Help: Information Risk Management (713) 853-5536 SAP/ISC (713) 345-4727 Unify On-Call (713) 284-3757 [Pager] Sitara On-Call (713) 288-0101 [Pager] RUS/GOPS/GeoTools/APRS (713) 639-9726 [Pager] OSS/UA4/TARP (713) 285-3165 [Pager] CPR (713) 284-4175 [Pager] EDI Support (713) 327-3893 [Pager] EES Help Desk (713)853-9797 OR (888)853-9797