Message-ID: <11845481.1075855492209.JavaMail.evans@thyme> Date: Thu, 19 Apr 2001 02:58:00 -0700 (PDT) From: smcfadden@igservice.com To: frank.ermis@enron.com Subject: [Fwd: FW: Wild Goose Open Season Package] Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Suzanne McFadden X-To: frank.ermis@enron.com X-cc: X-bcc: X-Folder: \Frank_Ermis_Jun2001\Notes Folders\All documents X-Origin: Ermis-F X-FileName: fermis.nsf Frank, I am attempting to re-deliver an e-mail that was addressed in error originally. Please take a moment to review this forwarded Open Season offer from our client company, Wild Goose Storage. Thanks very much, Suzanne Return-Path: Received: from falcon.mail.pas.earthlink.net ([207.217.120.74]) by crane (EarthLink SMTP Server) with ESMTP id tds70c.qci.37tiu1c for ; Wed, 18 Apr 2001 15:58:20 -0700 (PDT) Received: from mark (pool0362.cvx21-bradley.dialup.earthlink.net [209.179.193.107]) by falcon.mail.pas.earthlink.net (EL-8_9_3_3/8.9.3) with ESMTP id PAA04733 for ; Wed, 18 Apr 2001 15:55:11 -0700 (PDT) From: mbaldwin@igservice.com To: "Suzanne McFadden" Subject: FW: Wild Goose Open Season Package Date: Wed, 18 Apr 2001 15:55:16 -0700 Message-ID: <000e01c0c85a$a24ad940$6bc1b3d1@mark> MIME-Version: 1.0 Content-Type: multipart/mixed; boundary="----=_NextPart_000_000F_01C0C81F.F5EC0140" X-Priority: 3 (Normal) X-MSMail-Priority: Normal X-Mailer: Microsoft Outlook 8.5, Build 4.71.2173.0 X-MimeOLE: Produced By Microsoft MimeOLE V5.00.2615.200 Importance: Normal X-Mozilla-Status2: 00000000 -----Original Message----- From: Ledene, Ben [mailto:BenLedene@aec.ca] Sent: Monday, April 16, 2001 1:07 PM To: Mark Baldwin (E-mail) Subject: FW: Wild Goose Open Season Package > -----Original Message----- > From: Ledene, Ben > Sent: Wednesday, April 11, 2001 4:39 PM > To: Kathy Russeth (E-mail) > Subject: FW: Wild Goose Open Season Package > > > > -----Original Message----- > From: Ledene, Ben > Sent: Wednesday, April 11, 2001 3:53 PM > To: Alan Vallow; Angela Jones; Angela Jones (E-mail); Barry Brunelle > (E-mail); Bill Collier; Bill Fagan (E-mail); Bill Wood; Brad Barnds > (E-mail); Brent Balog; Brent Rook (E-mail); Carole Poulter; Cathy Bulf; > Chris Kiriakou; Chris Price (E-mail); Colin Coe (E-mail); Dan Thomas; > Daniel Kramer; Dave Clare (E-mail); Dave Jones (E-mail); Dave Kohler > (E-mail); David Ellis (E-mail); David Kuhn; David Schnake; David Swapp; > Denette Johnson (E-mail); Denis St. Jean; Don Clements (E-mail); Dorothy > Rothrock; Ed Brewer (E-mail); Ed Yates; Edward Miller; Elena Schmid; Erin > Mullane; Frank Ermis (E-mail); Gary Collins; Gary Kline (E-mail); Gary > Venz (E-mail); Greg Salyer; Gwoon Tom (E-mail); Janet Aery; Jason > Sandmaier (E-mail); Jay Cattermole; Jim Harlan; Jim Lynch; Joe Heller > (E-mail); Joe Holmes; John Emley; Joseph Sestak (E-mail); Junona Jonas; > Karen Jarrell; Katie Elder; Ken Bradley; Ken Downey; Ken Peck; Kevin Coyle > (E-mail); Kevin Legg (E-mail); Kirk Ketcherside (E-mail); Kirk Kittleson; > Kirk Morgan; Kirk Stone; KoKo Cordova; LoreLei Reid (E-mail); Lynn > Dahlberg; Mark Baldwin (E-mail); Marshall Clark; Marty McFadden; Matt > Gravelle; Micael Rochman; Michael D'arienzo; Michael Shoemaker (E-mail); > Michelle Lokay; Mike Beckner (E-mail); Monica Padilla (E-mail); Nathan > Reinhardt (E-mail); Pat Abercrombie (E-mail); Pat Keener; Patrick Mulhern; > Paul Amirault; Paul Gendron (E-mail); Paul Wood; Peter Lund; Phil > Richardson; Ray McCluer (E-mail); Richard Stone; Sandra Henry; Scott W. > Walton (E-mail); Stan Hemmeline; Stephanie Katz; Stephen J. Swain > (E-mail); Steve Izarry; Steve South (E-mail); Sue Gustofson; Susan Jones > (E-mail); Sylvia Pollan; Teresa Murray; Terry Stringer; Thomas Hannigan; > Todd Slawson; Tom Lee; Tom Toerner (E-mail); Trista Berkovitz (E-mail); > Troy W. Brothers (E-mail); Valdez; Weaman Ng (E-mail) > Subject: Wild Goose Open Season Package > > Expansion Firm Base Load Storage ("BLS") Service Open Season > > Wild Goose Storage Inc. is planning to expand its facility located in > Butte County in northern California and connected to PG&E for service > commencing as early as April 1, 2003. This expansion could increase the > facility capacities as follows: > > Existing Capacity Capacity Following Expansion > Working Gas Volume 14 Bcf 38 > Bcf > Maximum Injection Rate 80 MMcfd 450 > MMcfd > Maximum Withdrawal Rate 200 MMcfd 650 MMcfd > > This open season provides for an in-service date commencing April 1, 2004 > and an opportunity to participate in an "early service option" which could > have service available by April 1, 2003. The in-service date is subject to > CPUC approval by September 1, 2002 and the successful completion of new > facility construction. > > Customer offers are required by 2:00 pm MST, Tuesday May 22, 2001 > > Customer offers must be reasonably open for acceptance by Wild Goose > Storage Inc. until 2:00 pm MST, Wednesday June 20, 2001 subject only to > significant changes in market conditions and final approval of customer's > management. Preference for offer acceptance will be toward longer-term > contracts (greater than 5 years) and offers, which exceed 100% of our rack > rate. The offer sheets are provided in Microsoft Excel and are set up to > calculate the percentage of rack rate for your convenience. It is the > intent of Wild Goose Storage Inc. to negotiate and conclude contracts with > the participants providing acceptable offers in this open season as close > as possible to June 20, 2001. Wild Goose will announce to all contracted > participants whether it will proceed with the expansion in early August > 2001. Wild Goose Storage Inc. reserves the right to not necessarily accept > the highest priced offer nor to award all or any of the storage capacity > available. > > A reasonable summary of the main terms and features of BLS service is > attached for your convenience (Attached File - BLS Summary), but should > not be used as the sole terms by which service is to be provided. All > service is subject to the Tariff Schedules for Natural Gas Storage Service > of Wild Goose Storage Inc., as approved by the Public Utilities Commission > of the State of California. > > For more information about Wild Goose Storage Inc. or to download a copy > of the entire tariff please refer to our web site at > www.wildgoose-storage.com. > > Customer offers must include the following: > > A) Completed Offer Forms (Attached File - Offer Sheets) for each period of > service including: > > * the amount of Inventory Capacity Required for each April to March > period during the term > * the amount of Maximum Daily Injection Quantity Required by month > during the term > * the amount of Maximum Daily Withdrawal Quantity Required by month > during the term > * the Total Storage Demand Charge for each April to March period > during the term > * the Injection Commodity Rate for each April to March period during > the term > * the Withdrawal Commodity Rate for each April to March period during > the term > * a signature from an authorized employee of the company verifying the > offer > > In the 'Offer Sheets' file attachment you will find the following tabs at > the bottom: > > * an offer sheet in Excel format > * a manual offer sheet which can be printed out and filled in by hand > * an example offer > > B) An executed Storage Services Agreement (Attached File - Storage > Services Agreement) unless your company already has one on file with Wild > Goose Storage Inc. > > Early Service Option > > Once Wild Goose Storage Inc. gives notice in early August 2001 to proceed > with the expansion, every effort will be made to complete construction as > early as possible. Notice will be given by November 1, 2002 if service > will be available earlier than April 1, 2004. All contracted participants > will have the right, but not the obligation, to amend their contracts to > the earlier term start date and add this additional service to their > existing contracts at the same fees negotiated for the first year of > service commencing April 1, 2004. > > Rack Rates > Our rates are 'market based' meaning they are fully negotiable, but our > 'rack rates' are as follows: > Monthly Storage Demand Charges > * Inventory($/Dth) $0.03 > * Injection ($/Dth/day) $3.00 > * Withdrawal ($/Dth/day) $2.00 > > Variable Charges > * Injection Commodity Rate ($/Dth) $0.02 > * Withdrawal Commodity Rate ($/Dth) $0.02 > > Fuel Charges > > In addition to the Demand and Variable charges described above, fuel costs > are also charged based on actual consumption by customer and the value of > the gas on a daily basis. Fuel consumption is expected to be between 1.25 > to 1.75%. For details, please refer to the Wild Goose tariff. > > If you have any questions about this matter or need hard copies, please > contact either Ben Ledene with Wild Goose in Calgary at (403) 266-8192 or > Chris Price and Mark Baldwin with Interstate Gas Services in California at > (925) 243-0350. > <> <> < Agreement.doc>> <> - BLS Summary.doc - Expansion Offer Sheet.xls - Storage Services Agreement.doc - Wild Goose Expansion Open Season.doc