Message-ID: <33458209.1075853973906.JavaMail.evans@thyme> Date: Thu, 2 Nov 2000 02:22:00 -0800 (PST) From: edward.gottlob@enron.com To: daren.farmer@enron.com, pat.clynes@enron.com, lauri.allen@enron.com, janet.wallis@enron.com Subject: Re: Copano Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Edward D Gottlob X-To: Daren J Farmer, Pat Clynes, Lauri A Allen, Janet H Wallis X-cc: X-bcc: X-Folder: \Darren_Farmer_Dec2000\Notes Folders\All documents X-Origin: Farmer-D X-FileName: dfarmer.nsf ---------------------- Forwarded by Edward D Gottlob/HOU/ECT on 11/02/2000 10:21 AM --------------------------- Steve HPL Schneider 11/02/2000 08:48 AM To: Edward D Gottlob/HOU/ECT@ECT cc: Subject: Re: Copano That is my understanding. Edward D Gottlob 11/01/2000 07:29 AM To: Steve HPL Schneider/HOU/ECT@ECT cc: James McKay/HOU/ECT@ECT, Pat Clynes/Corp/Enron@ENRON Subject: Re: Copano the Lakecreek lateral is baseload for the expected load, the set point may change up and down in anticipation of weather changes but pressure supply for Entex is provided via the Copano 12", Entex shouldcommunicate with us directly. Steve HPL Schneider 10/31/2000 02:59 PM To: Edward D Gottlob/HOU/ECT@ECT cc: James McKay/HOU/ECT@ECT, Pat Clynes/Corp/Enron@ENRON Subject: Re: Copano That is not what I am conveying. There may be changes made to the set flow periodically, but it will not be pressure based upon the immediate needs of the Copano pipeline that may be swinging due to some other customer on their system. Whenever Entex asks for a new set point at the new Woodlands city gate, our set point at the new Bammel interconnect should align with that same set point so as there is no swing service on the Copano pipeline. Our instructions should only come from Entex to change the set point, and should be confirmed with Copano. We are not to provide any instantaneous swing service on the Copano Lake Creek lateral. Any swing provided by HPL for the Woodland's load will be made into the Copano 12" (formerly KSC) line as historically done. There may be additional capacity needed on the Lake Creek lateral because of the revised set point, but that is something that Entex has negotiated with Copano independent of HPL. Still fuzzy? Edward D Gottlob 10/31/2000 07:46 AM To: Steve HPL Schneider/HOU/ECT@ECT cc: Pat Clynes/Corp/Enron@ENRON, James McKay/HOU/ECT@ECT Subject: Re: Copano Steve, Baseload means rateable flows throughout the 24 hour gas day? No swing with weather?