Message-ID: <10755279.1075840432500.JavaMail.evans@thyme> Date: Fri, 2 Nov 2001 12:46:22 -0800 (PST) From: brandee.jackson@enron.com To: kirk.lenart@enron.com, l..schrab@enron.com, bonnie.chang@enron.com, tammy.gilmore@enron.com, kevin.brady@enron.com, p..adams@enron.com, shannon.groenewold@enron.com, jesse.villarreal@enron.com, lisa.trofholz@enron.com, tamara.carter@enron.com, shanna.boudreaux@enron.com, christina.sanchez@enron.com, kelly.loocke@enron.com, robert.ramirez@enron.com, joann.collins@enron.com, robert.allwein@enron.com, dan.prudenti@enron.com, lia.halstead@enron.com, meredith.homco@enron.com, airam.arteaga@enron.com Subject: ON CALL Cc: victor.lamadrid@enron.com, lisa.kinsey@enron.com, robert.superty@enron.com, j..farmer@enron.com, patti.sullivan@enron.com, kevin.heal@enron.com, peggy.hedstrom@enron.com, lisa.mcisaac@enron.com Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit Bcc: victor.lamadrid@enron.com, lisa.kinsey@enron.com, robert.superty@enron.com, j..farmer@enron.com, patti.sullivan@enron.com, kevin.heal@enron.com, peggy.hedstrom@enron.com, lisa.mcisaac@enron.com X-From: Jackson, Brandee X-To: Lenart, Kirk , Schrab, Mark L. , Chang, Bonnie , Gilmore, Tammy , Brady, Kevin , Adams, Jacqueline P. , Groenewold, Shannon , Villarreal, Jesse , Trofholz, Lisa , Carter, Tamara , Boudreaux, Shanna , Sanchez, Christina , Loocke, Kelly , Ramirez, Robert , Collins, Joann , Allwein, Robert , Prudenti, Dan , Halstead, Lia , Homco, Meredith , Arteaga, Airam X-cc: Lamadrid, Victor , Kinsey, Lisa , Superty, Robert , Farmer, Daren J. , Sullivan, Patti , Heal, Kevin , Hedstrom, Peggy , McIsaac, Lisa X-bcc: X-Folder: \ExMerge - Farmer, Darren\Logistics X-Origin: FARMER-D X-FileName: darren farmer 6-26-02.pst Brandee Jackson 713-345-4013 ------------------------------------------------------------------------------------------------------ W E E K E N D S Y S T E M S A V A I L A B I L I T Y F O R November 2, 2001 5:00pm through November 5, 2001 12:00am ------------------------------------------------------------------------------------------------------ SCHEDULED SYSTEM OUTAGES: ARDMORE DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages. AZURIX: No Scheduled Outages. EB34 DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages. EDI: Impact: CORP Time: Fri 11/2/2001 at 12:00:00 PM CT thru Sun 11/4/2001 at 4:00:00 AM CT Fri 11/2/2001 at 10:00:00 AM PT thru Sun 11/4/2001 at 2:00:00 AM PT Fri 11/2/2001 at 6:00:00 PM London thru Sun 11/4/2001 at 10:00:00 AM London Outage: EDI_QA Oracle database upgrade Environments Impacted: Corp Purpose: To comply with corporate standardization Backout: Restore the database to its original state Contact(s): Maria Santiago 713-345-7354 John Kratzer 713-345-7672 Karen O'Grady 713-345-7149 EES: Impact: EES Time: Thu 11/1/2001 at 6:00:00 PM CT thru Sun 11/4/2001 at 12:00:00 AM CT Thu 11/1/2001 at 4:00:00 PM PT thru Sat 11/3/2001 at 10:00:00 PM PT Fri 11/2/2001 at 12:00:00 AM London thru Sun 11/4/2001 at 6:00:00 AM London Outage: Migrate EESHOU-FS1to SAN Environments Impacted: EES Purpose: New Cluster server is on SAN and SAN backups This will provide better performance, server redundancy, and backups should complete without problems. Backout: Take new server offline, Bring up old servers change users profiles back to original settings. Contact(s): Roderic H Gerlach 713-345-3077 ENRON CENTER SOUTH DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages ENRON NORTH AMERICAN LANS: Impact: Ardmore Time: Sat 11/3/2001 at 10:00:00 PM CT thru Sun 11/4/2001 at 2:00:00 AM CT Sat 11/3/2001 at 8:00:00 PM PT thru Sun 11/4/2001 at 12:00:00 AM PT Sun 11/4/2001 at 4:00:00 AM London thru Sun 11/4/2001 at 8:00:00 AM London Outage: Add redundant connections between ARD-COR-CCX1/2 and ENA-CX1/2-ARD Environments Impacted: All Purpose: Increased bandwidth / resiliency available on the MAN Backout: Put original equipment/configs back in place Contact(s): Dennis McGough 713-345-3143 Impact: EBS Time: Sat 11/3/2001 at 1:00:00 PM CT thru Sat 11/3/2001 at 4:00:00 PM CT Sat 11/3/2001 at 11:00:00 AM PT thru Sat 11/3/2001 at 2:00:00 PM PT Sat 11/3/2001 at 7:00:00 PM London thru Sat 11/3/2001 at 10:00:00 PM London Outage: Relocate EBS Portland servers and switch pdx-3wtcpl-swx1 Environments Impacted: EBS Purpose: Existing equipment rack removed in order to install new phone system. Backout: None. Space must be vacated. Contact(s): Chris Shirkoff 503-778-0920 8774937918@skytel.com Dave Steiner 503-703-1553 FIELD SERVICES: No Scheduled Outages. INTERNET: No Scheduled Outages. MESSAGING: Impact: Corp Notes Time: Fri 11/2/2001 at 9:00:00 PM CT thru Sat 11/3/2001 at 1:00:00 AM CT Fri 11/2/2001 at 7:00:00 PM PT thru Fri 11/2/2001 at 11:00:00 PM PT Sat 11/3/2001 at 3:00:00 AM London thru Sat 11/3/2001 at 7:00:00 AM London Outage: cNotes Server Reboots Environments Impacted: All users on any of the mailservers listed below Purpose: Scheduled @ 2 week interval Backout: Make sure server comes up. Contact(s): Trey Rhodes (713) 345-7792 Impact: EI Time: Fri 11/2/2001 at 9:00:00 PM CT thru Sat 11/3/2001 at 1:00:00 AM CT Fri 11/2/2001 at 7:00:00 PM PT thru Fri 11/2/2001 at 11:00:00 PM PT Sat 11/3/2001 at 3:00:00 AM London thru Sat 11/3/2001 at 7:00:00 AM London Outage: EI Notes Server Maintenance Environments Impacted: EI Local/Domestic/Foreign Sites Purpose: Scheduled @ 2 week interval Backout: N/A Contact(s): David Ricafrente 713-646-7741 Impact: EES Time: Fri 11/2/2001 at 8:30:00 PM CT thru Fri 11/2/2001 at 11:30:00 PM CT Fri 11/2/2001 at 6:30:00 PM PT thru Fri 11/2/2001 at 9:30:00 PM PT Sat 11/3/2001 at 2:30:00 AM London thru Sat 11/3/2001 at 5:30:00 AM London Outage: EES Notes Server Reboots Environments Impacted: All users on any of the mailservers listed below Purpose: Scheduled @ 2 week interval on 1st and the 3rd Friday of each month. Backout: Contact(s): Dalak Malik 713-345-8219 MARKET DATA: No Scheduled Outages. NT: No Scheduled Outages. OS/2: No Scheduled Outages. OTHER: Impact: Time: Sat 11/3/2001 at 9:00:00 PM CT thru Sun 11/4/2001 at 12:00:00 AM CT Sat 11/3/2001 at 7:00:00 PM PT thru Sat 11/3/2001 at 10:00:00 PM PT Sun 11/4/2001 at 3:00:00 AM London thru Sun 11/4/2001 at 6:00:00 AM London Outage: Migrate EBS Common Data to Corp Environment and update DFS Environments Impacted: Any user accessing o: EBS Purpose: Will be migrating all common data from o: EBS Houston and o: EBS Portland to Corp servers in Houston and their corresponding EBS servers will be decommissioned. o: ebs shepherd and o: ebs loopcentral will also be migrated and their corresponding EBS servers will be decommissioned. o: EBS will be removed from DFS and the DFS entries will be re-inputed in order to decommission the EBS DFS server. This needs to be done as part of the decommissioning of the EBS environment. Backout: Leave EBS data servers and DFS servers online and re-input the DFS links. Contact(s): Mark Wolf 713-345-6389 Impact: HR Time: Sat 11/3/2001 at 8:00:00 AM CT thru Sat 11/3/2001 at 11:00:00 AM CT Sat 11/3/2001 at 6:00:00 AM PT thru Sat 11/3/2001 at 9:00:00 AM PT Sat 11/3/2001 at 2:00:00 PM London thru Sat 11/3/2001 at 5:00:00 PM London Outage: Replace CD-ROM in HR-DB-5 Environments Impacted: HR LAN Purpose: The CD-ROM drive has failed and needs to be replaced. Backout: Contact(s): Brandon Bangerter 713-345-4904 Mark Calkin 713-345-7831 Raj Perubhatla 713-345-8016 281-788-9307 Impact: nahou-rem2 Time: Sun 11/4/2001 at 1:00:00 PM CT thru Sun 11/4/2001 at 1:30:00 PM CT Sun 11/4/2001 at 11:00:00 AM PT thru Sun 11/4/2001 at 11:30:00 AM PT Sun 11/4/2001 at 7:00:00 PM London thru Sun 11/4/2001 at 7:30:00 PM London Outage: Upgrade nahou-rem2 server with latest Remedy Patch Environments Impacted: Remedy Reporting Server Purpose: Plug a memory leak in the current version patch. Backout: Remove the new executable and rename the arserver.old to arserver.exe Contact(s): James Weaver 713-345-4810 SITARA: No Scheduled Outages. SUN/OSS SYSTEM: No Scheduled Outages. TELEPHONY: No Scheduled Outages TERMINAL SERVER: No Scheduled Outages. UNIFY: No Scheduled Outages. ---------------------------------------------------------------------------------------------------------------------------- FOR ASSISTANCE (713) 853-1411 Enron Resolution Center Specific Help: Information Risk Management (713) 853-5536 SAP/ISC (713) 345-4727 Unify On-Call (713) 284-3757 [Pager] Sitara On-Call (713) 288-0101 [Pager] RUS/GOPS/GeoTools/APRS (713) 639-9726 [Pager] OSS/UA4/TARP (713) 285-3165 [Pager] CPR (713) 284-4175 [Pager] EDI Support (713) 327-3893 [Pager] EES Help Desk (713)853-9797 OR (888)853-9797 TDS -Trader Decision Support On-Call (713) 327-6032 [Pager]