Message-ID: <17709255.1075840442380.JavaMail.evans@thyme> Date: Tue, 26 Mar 2002 03:18:00 -0800 (PST) From: philippe.giguere@enron.com To: mark.fisher@enron.com Subject: Request for SCADA power curves Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Philippe Giguere X-To: Mark Fisher X-cc: X-bcc: X-Folder: \mark fischer 7-12-02\Notes Folders\All documents X-Origin: FISCHER-M X-FileName: mark fischer 7-12-02 LNotes.nsf Mark: As per our phone conversation, please generate these two bin-averaged power curves for turbine #2 at Montfort. 1) Consider all data from the month of February 2) Consider data only from Feb. 9 to the end of February Please use 0.5 m/s bins. The prefered output for this work is a single plot showing both power curves. Getting these results by the end of this week would be perfect. Thanks, Philippe