Message-ID: <31665366.1075840467502.JavaMail.evans@thyme> Date: Thu, 4 Apr 2002 07:55:00 -0800 (PST) From: kurt.anderson@enron.com To: wcmarshall@aep.com Subject: WR574 Clear Sky Wind data Cc: bo.thisted@enron.com, mark.fisher@enron.com, mark.walker@enron.com, george.griese@enron.com, dave.schulgen@enron.com, hollis.kimbrough@enron.com, kevin.cousineau@enron.com Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit Bcc: bo.thisted@enron.com, mark.fisher@enron.com, mark.walker@enron.com, george.griese@enron.com, dave.schulgen@enron.com, hollis.kimbrough@enron.com, kevin.cousineau@enron.com X-From: Kurt Anderson X-To: wcmarshall@aep.com X-cc: Bo Thisted, Mark Fisher, Mark V Walker, George Griese, Dave Schulgen, Hollis Kimbrough, Kevin Cousineau X-bcc: X-Folder: \mark fischer 7-12-02\Notes Folders\Notes inbox X-Origin: FISCHER-M X-FileName: mark fischer 7-12-02 LNotes.nsf Ward, As per your request, attached is the wind data, and curtailment information from Clear Sky for the month of January. Please note that due to a lack of 10 min. data from SCADA, the turbine data for the month of January is not available. We are confident that this situation will not be repeated. It is also important to note that periods of curtailment were derived from the manual log provided by the site. There were 13 periods between 1/22/2002 and 1/31/2002. Since turbine nacelle wind speeds were not available, 4 met stations were selected (0648, 0651,0652,0659). The met station data is recorded hourly. The wind speeds were extrapolated to hub height using shear estimates. The hub height wind speeds were converted to kWh by applying the Clear Sky Power curve. For each curtailment period the kWh values were summed to give an estimate from each met tower, the four estimates were averaged, the averages were then multiplied by the number of curtailed turbines. This generated a estimate for each curtailment period. These values were then multiplied by .97*.98 (97% availability and 2% line loss) as spelled out in section 2.(b) of the PPA, to get a net loss. For January 2002 the sum of these estimates was 1,770,692 kWh. If there are additional requirements you may contact me at (661) 823-6886 or direct Rich Simon to contact Mark Fisher of our Data Analysis group at (661) 823-6545.