Message-ID: <5634689.1075842555188.JavaMail.evans@thyme> Date: Fri, 22 Dec 2000 02:03:00 -0800 (PST) From: drew.fossum@enron.com To: kevin.hyatt@enron.com Subject: Re: Pueblo Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Drew Fossum X-To: Kevin Hyatt X-cc: X-bcc: X-Folder: \Drew_Fossum_Dec2000_June2001_2\Notes Folders\Sent X-Origin: FOSSUM-D X-FileName: dfossum.nsf I'm glad to have Tino talk to him direct--tee it up that way if you can. Tino's new number is 913-441-1800 (ext. 109). Thanks Kevin and have a great holiday!! DF Kevin Hyatt 12/21/2000 05:26 PM To: Drew Fossum/ET&S/Enron@ENRON cc: Subject: Re: Pueblo I left Steve Thome (503-539-2340) in Portland a voice msg on this. He is travelling. I'll check my voicemail while I'm out next week or feel free to have Tino call him direct. kh Enron Energy Services From: Drew Fossum 12/19/2000 03:35 PM To: Kevin Hyatt/ET&S/Enron@Enron cc: Steven Harris/ET&S/Enron@Enron Subject: Pueblo Latest Tino-gram: Apparently high power prices at 4 Corners have DOE excited about the project all of a sudden. The latest configuration is in the 300-380 mw range. Tino needs us to check if the ENA guys would be interested in buying the surplus capacity on a demand charge basis (I think these are basically tolling agreements--ENA would pay a monthly capacity reservation charge per KW of capacity and then pay actual fuel and variable cost for power that is actually dispatched) $7/kw if the thing is simple cycle or $10/kw if combined cycle. Variable cost would be $.005/kwh and fuel is whatever it is--ENA's problem. I'm trying to get ahold of Tino to confirm, but I think these are prices at the plant, not FOB 4 Corners. Please give me a call and see if you can get a quick reaction from our ENA guys. Thanks. DF