Message-ID: <8368428.1075853684700.JavaMail.evans@thyme> Date: Fri, 21 Jul 2000 02:38:00 -0700 (PDT) From: chris.germany@enron.com To: paul.leanza@enron.com Subject: Re: PNG Local Production July 00 Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Chris Germany X-To: Paul J Leanza X-cc: X-bcc: X-Folder: \Chris_Germany_Dec2000\Notes Folders\All documents X-Origin: Germany-C X-FileName: cgerman.nsf Just send me $50 and we won't worry about it. I would also like a new golf shirt but I don't think I want the name Clinton on it right now. Try to get me an AEP shirt. Paul J Leanza@EES 07/21/2000 08:59 AM To: Chris Germany/HOU/ECT@ECT, kdstep@ceg.com cc: John Dietrich/DUB/EES@EES Subject: Re: PNG Local Production July 00 Here is what I know. We started pulling 430 MCF (443 dth) from pool N424PB effective 7-1-00 which was changed to 430 dth effective 7-18-00. I'm assuming pool N424PB is the CES/ENA non-priority pool. Let me know if we need to do anything different on our side. Paul Chris Germany@ECT 07/18/2000 05:23 PM To: kdestep@columbiaenergygroup.com @ ENRON, dkinney@columbiaenergygroup.com cc: Angie Zeman/Corp/Enron@ENRON, Paul J Leanza/DUB/EES@EES, John M Singer/Corp/Enron@ENRON Subject: Re: PNG Local Production July 00 Actually, we should be nominating only 4,000 month from Power Gas and 300 day from Phillips Production. That works out to about 429 day. I just spoke to Samson and he agrees the volume for July should only be 4,000 for the month. AND Angie (my super fantastic, can't say enough good things about her, will probably be my boss someday and sometimes acts like it, CNG scheduler) has agreed to help out any way she can. She knows escript pretty well. Chat with Doug, if you guys agree, Angie can use your ID and password and figure out how to run all the reports we need back to January. Also, we will not know the actuals for July production until September sometime. Effective August 1st, the Phillip's wells should be transferred to Clinton's brand new pool and Clinton will also nominate the Power Gas pool gas. Doug, John Singer said he does not have any production reports from Heidi. With Angie's help, we could probably clear up the CNG LDC activity fairly easy. Let me know what you guys think. kdestep@columbiaenergygroup.com on 07/18/2000 02:02:39 PM To: " - *Chris_Germany@enron.com" , " - *pleanza@enron.com" cc: " - *Kinney, Doug" Subject: PNG Local Production July 00 Hi Paul and Chris, Our friend Sampson at Power Gas still maintains that their local production behind PNG has not been nominated for July yet, which was 7500 dth/month. Did you guys do a deal for this gas too? He usually nominates it all on one day, so Clinton/CES needs to coordinate with him what day to do it on (right now the gas is out there on his side on the 17th). I know Heidi nominated the Phillips gas baseloaded thru the month at 443/day, but I was not sure about the Power, until I checked and sure enough the nom isn't out there yet. I can get help nominating it from PNG to get it through CES' pool but I want to make sure that's what we need to do. Just give me the word and I will call Sampson to get it done, but I will make it clear to him that this is the last month he'll need to talk to me about it. Thank you very much for the clarifications! Kara D. aka the lone ranger at CES