Message-ID: <27060228.1075840614383.JavaMail.evans@thyme> Date: Mon, 29 Jan 2001 02:49:00 -0800 (PST) From: cara.semperger@enron.com To: matt.motley@enron.com, mark.fischer@enron.com, tom.alonso@enron.com, portland.shift@enron.com, sean.crandall@enron.com, diana.scholtes@enron.com, lisa.gang@enron.com, stacy.runswick@enron.com, michael.driscoll@enron.com, paul.choi@enron.com, greg.wolfe@enron.com Subject: New TTC at Palo Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Cara Semperger X-To: Matt Motley, Mark Fischer, Tom Alonso, Portland Shift, Sean Crandall, Diana Scholtes, Lisa Gang, Stacy Runswick, Michael M Driscoll, Paul Choi, Greg Wolfe X-cc: X-bcc: X-Folder: \mark guzman 6-28-02\Notes Folders\All documents X-Origin: GUZMAN-M X-FileName: mark guzman 6-28-02.nsf This notification was on the SRP Oasis webstie" "The owners of Palo Verde East transmission system have completed studies supporting an increase in the system's rating from 3810 MW to 4750 MW. This increase in TTC affects the PV-WestWing 500kV #1 and #2 transmission lines adn the PV-Kyrene 500kV transmission line path rating. This new TTC will become effective at 12:01 am on February 1, 2001 The owners of the three transmission lines are Arizona Public Service, El Paso Electric Company, PNM, and SRP. The increased rating will be allocated to each company based upon their ownership share of the transmission lines."