Message-ID: <24640984.1075860430128.JavaMail.evans@thyme> Date: Thu, 21 Jun 2001 09:34:00 -0700 (PDT) From: enron.announcements@enron.com To: all.houston@enron.com Subject: Weekend Outage Report for 6-22-01 through 6-25-01 Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Enron Announcements X-To: All Enron Houston X-cc: X-bcc: X-Folder: \Mary_Hain_Aug2000_Jul2001\Notes Folders\Discussion threads X-Origin: Hain-M X-FileName: mary-hain.nsf ------------------------------------------------------------------------------ ------------------------ W E E K E N D S Y S T E M S A V A I L A B I L I T Y F O R June 22, 2001 5:00pm through June 25, 2001 12:00am ------------------------------------------------------------------------------ ------------------------ ECS to ECN Network Interconnection WILL BE RESCHEDULED This is a notification that the Enron Corp. I/T Networks team will be connecting the new building network infrastructure located in Enron Center South (ECS) to the existing Enron Center North (ECN) backbone network. While this activity is not expected to produce a disruption to network services, this notice is designed to alert the organization to our activities. No network hardware or systems are anticipated to be shutdown. The actual physical interconnection of the networks will be performed in the EB 34th floor Data Center. If you have any further questions, please contact Pete Castrejana at 713-410-0642 for more information. SCHEDULED SYSTEM OUTAGES: ARDMORE DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages. AZURIX: No Scheduled Outages. EB34 DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages. EDI SERVER: Impact: CORP Time: Sat 6/23/2001 at 11:00:00 PM CT thru Sun 6/24/2001 at 2:00:00 AM CT Sat 6/23/2001 at 9:00:00 PM PT thru Sun 6/24/2001 at 12:00:00 AM PT Sun 6/24/2001 at 5:00:00 AM London thru Sun 6/24/2001 at 8:00:00 AM London Outage: EDI_HUB System Reboot Environments Impacted: Corporate Purpose: Preventive maintenance to improve High Availability and System recovery capability Backout: Defer reboot Contact(s): Alex Tudor 713-853-3895 713-318-1987 Jack Metkus 713-853-3062 713-288-0743 Maria Santiago 713-345-7354 713-406-0588 ENRON CENTER SOUTH DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages ENRON NORTH AMERICAN LANS: Impact: R: drive for the corp users Time: Fri 6/22/2001 at 10:30:00 PM CT thru Sat 6/23/2001 at 2:30:00 AM CT Fri 6/22/2001 at 8:30:00 PM PT thru Sat 6/23/2001 at 12:30:00 AM PT Sat 6/23/2001 at 4:30:00 AM London thru Sat 6/23/2001 at 8:30:00 AM London Outage: General Application Server Storage Upgrade Environments Impacted: All CORP users provided applications on the R: drive. Sitara, CMS, Equity Trading Systems, Adaytum, CQG, TMS, PowerMap Europe, PowerDat Europe, MapInfo Professional, & Secretariat Purpose: The storage space for the application server environment will be upgraded with 3 additional volumes to accommodate growth as the volumes are at capacity. All applications residing on the R: drive will be temporarily unavailable from Friday, June 22, 2001 at 10:30 P.M. until Saturday June 23, 2001 at 2:30 A.M. for users logging into the CORP domain serviced by Enron Net Works. The outage is needed to perform required system maintenance updates and increase the storage capacity of the general application servers hosting the applications managed by the Enron Net Works Distributed Application Management group. Backout: Should the upgrade volumes or maintenance updates render the primary node server inoperable the secondary node will be brought on-line with all volumens maintaining current configuration. Contact(s): Chris Jeska 713-345-7004 Brian Larkin 713-853-6985 Impact: Corp Time: Sun 6/24/2001 at 10:00:00 AM CT thru Sun 6/24/2001 at 1:00:00 PM CT Sun 6/24/2001 at 8:00:00 AM PT thru Sun 6/24/2001 at 11:00:00 AM PT Sun 6/24/2001 at 4:00:00 PM London thru Sun 6/24/2001 at 7:00:00 PM London Outage: Apply Windows 2000 SP2 to Houston CORP Domain Controllers Environments Impacted: Corp Purpose: SP2 is being applied to all domain controllers to resolve security issues. Backout: Uninstall SP2. Contact(s): Robert Stine 713-345-5214 FIELD SERVICES: No Scheduled Outages. INTERNET: No Scheduled Outages. MESSAGING: No Scheduled Outages. MARKET DATA: No Scheduled Outages. NT: No Scheduled Outages. OS/2: No Scheduled Outages. OTHER SYSTEMS: Impact: EBS Time: Fri 6/22/2001 at 6:00:00 PM CT thru Sat 6/23/2001 at 12:00:00 AM CT Fri 6/22/2001 at 4:00:00 PM PT thru Fri 6/22/2001 at 10:00:00 PM PT Sat 6/23/2001 at 12:00:00 AM London thru Sat 6/23/2001 at 6:00:00 AM London Outage: EBS Shepherd Location Environments Impacted: Shepherd Employees Purpose: To increase port Density as well as re-patch IDF panel to clean up cable management Backout: Exchange both 6509's back to the existing 6506's Contact(s): Jason Kilgo 713-345-3198 Impact: sysADMIRAL Batch Servers Time: Sat 6/23/2001 at 6:00:00 AM CT thru Sat 6/23/2001 at 6:00:00 PM CT Sat 6/23/2001 at 4:00:00 AM PT thru Sat 6/23/2001 at 4:00:00 PM PT Sat 6/23/2001 at 12:00:00 PM London thru Sun 6/24/2001 at 12:00:00 AM London Outage: SYSadmiral Server Rebuild Environments Impacted: None Purpose: Server NAHOU-BPS06P will be down and there will be no access during this period. Backout: Contact(s): Rusty Cheves 713-345-3798 Impact: CORP, OTS, ETS Time: Wed 6/27/2001 at 6:00:00 PM Outage: De-commission ENEDS01_ADAPT server Environments Impacted: DSS Users Purpose: Power off old DSS server, data has been moved to SQL 2000 server GTHOU-APPSQ03P/GTHOUSQRPT01P. Backout: None Contact(s): Joe Hellsten 713-853-7346 713-545-4164 Impact: CORP Time: Fri 6/22/2001 at 6:00:00 PM CT thru Fri 6/22/2001 at 8:00:00 PM CT Fri 6/22/2001 at 4:00:00 PM PT thru Fri 6/22/2001 at 6:00:00 PM PT Sat 6/23/2001 at 12:00:00 AM London thru Sat 6/23/2001 at 2:00:00 AM London Outage: CPU replacement for Orbix dev server midas. Environments Impacted: Orbix development. Purpose: Bad CPU needs replacement. Backout: restart sever without the cpu. Contact(s): Malcolm Wells 713-345-3716 SITARA: SEE ABOVE SUN/OSS SYSTEM: No Scheduled Outages. TELEPHONY: No Scheduled Outages TERMINAL SERVER: No Scheduled Outages. UNIFY: No Scheduled Outages. ------------------------------------------------------------------------------ ----------------------------------------------- FOR ASSISTANCE (713) 853-1411 Enron Resolution Center Specific Help: Information Risk Management (713) 853-5536 SAP/ISC (713) 345-4727 Unify On-Call (713) 284-3757 [Pager] Sitara On-Call (713) 288-0101 [Pager] RUS/GOPS/GeoTools/APRS (713) 639-9726 [Pager] OSS/UA4/TARP (713) 285-3165 [Pager] CPR (713) 284-4175 [Pager] EDI Support (713) 327-3893 [Pager] EES Help Desk (713)853-9797 OR (888)853-9797 TDS -Trader Decision Support On-Call (713) 327-6032 [Pager]