Message-ID: <25123939.1075860390230.JavaMail.evans@thyme> Date: Fri, 2 Mar 2001 08:20:00 -0800 (PST) From: mary.hain@enron.com To: javier.li@enron.com Subject: Re: Interconnection in Arizona Cc: paul.choi@enron.com, diana.scholtes@enron.com, chris.foster@enron.com, cara.semperger@enron.com, marc.pana@enron.com Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit Bcc: paul.choi@enron.com, diana.scholtes@enron.com, chris.foster@enron.com, cara.semperger@enron.com, marc.pana@enron.com X-From: Mary Hain X-To: Javier Li X-cc: Paul Choi, Diana Scholtes, Chris H Foster, Cara Semperger, Marc Pana X-bcc: X-Folder: \Mary_Hain_Aug2000_Jul2001\Notes Folders\Discussion threads X-Origin: Hain-M X-FileName: mary-hain.nsf I have looked on APS' OASIS for the substations you mentioned. The only one listed as a receipt point was Moenkopi. Below is a list of the other receipt points available. I'll be out next week but if you need help looking to see if transmission capacity is available Diana, Paul, or Cara may be able to help you. Cholla 345 Desert Basin Four Corners 230 Four Corners 345 GIla 69 Knox 230 Kyrene 230 Marketplace MCC5 Mead 230 Mead 500 NavaJo 500 North GIla 500 PNPKAPS 230 Saguaro 500 San Luis 34 West Wing 500 Yucca 69 Javier Li@EES 02/28/2001 01:48 PM To: Mary Hain/HOU/ECT@ECT cc: Marc Pana/HOU/EES@EES Subject: Interconnection in Arizona Mary, I am working with Jeff Golden and Marc Pana in EES Corporate Development. Marc asked me to send you a list of potential substations for interconnection of mobile generation in blocks of 25 MW to 50 MW. Here is a tentative list. Please feel free to suggest any other location you think is suitable for trading power in Palo Verde (either directly or with power displacement). Thanks for your attention. Javier. x. 34599 Tapco (has abandoned plant?) Ash Fork Williams Parks Winona Leupp Round Valley Cataract Creek Moenkopi Sedona Goodard Kirkland