Message-ID: <28797400.1075860432590.JavaMail.evans@thyme> Date: Fri, 15 Jun 2001 10:17:00 -0700 (PDT) From: enron.announcements@enron.com To: houston.report@enron.com Subject: SUPPLEMENTAL Weekend Outage Report for 6-15-01 through 6-18-01 Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Enron Announcements X-To: Houston Outage Report X-cc: X-bcc: X-Folder: \Mary_Hain_Aug2000_Jul2001\Notes Folders\Notes inbox X-Origin: Hain-M X-FileName: mary-hain.nsf ------------------------------------------------------------------------------ ------------------------ W E E K E N D S Y S T E M S A V A I L A B I L I T Y F O R June 15, 2001 5:00pm through June 18, 2001 12:00am ------------------------------------------------------------------------------ ------------------------ ECS to ECN Network Interconnection WILL BE RESCHEDULED This is a notification that the Enron Corp. I/T Networks team will be connecting the new building network infrastructure located in Enron Center South (ECS) to the existing Enron Center North (ECN) backbone network. While this activity is not expected to produce a disruption to network services, this notice is designed to alert the organization to our activities. No network hardware or systems are anticipated to be shutdown. The actual physical interconnection of the networks will be performed in the EB 34th floor Data Center. If you have any further questions, please contact Pete Castrejana at 713-410-0642 for more information. SCHEDULED SYSTEM OUTAGES: ARDMORE DATA CENTER - FACILITY OPERATIONS: Impact: Ardmore Data Center Time: Sat 6/16/2001 at 8:00:00 AM CT thru Sat 6/16/2001 at 10:00:00 AM CT Sat 6/16/2001 at 6:00:00 AM PT thru Sat 6/16/2001 at 8:00:00 AM PT Sat 6/16/2001 at 2:00:00 PM London thru Sat 6/16/2001 at 4:00:00 PM London Outage: PDU-E at Ardmore Data Center Environments Impacted: EES Purpose: To safely monitor voltage and amp readings on PDU. Backout: Contact(s): Joe Montemayor 713-345-3370 Steve Ritter 713-408-8734 AZURIX: No Scheduled Outages. EB34 DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages. EDI SERVER: No Scheduled Outages. ENRON CENTER SOUTH DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages ENRON NORTH AMERICAN LANS: SEE ORIGINAL REPORT FIELD SERVICES: No Scheduled Outages. INTERNET: No Scheduled Outages. MESSAGING: ALSO SEE ORIGINAL REPORT Impact: Corp Notes Time: Fri 6/15/2001 at 9:00:00 PM CT thru Sat 6/16/2001 at 1:00:00 AM CT Fri 6/15/2001 at 7:00:00 PM PT thru Fri 6/15/2001 at 11:00:00 PM PT Sat 6/16/2001 at 3:00:00 AM London thru Sat 6/16/2001 at 7:00:00 AM London Outage: cNotes Server Reboots Environments Impacted: All users on any of the mailservers listed below Purpose: Scheduled @ 2 week interval Backout: Make sure server comes up. Contact(s): Trey Rhodes (713) 345-7792 Impact: EI Time: Fri 6/15/2001 at 9:00:00 PM CT thru Sat 6/16/2001 at 1:00:00 AM CT Fri 6/15/2001 at 7:00:00 PM PT thru Fri 6/15/2001 at 11:00:00 PM PT Sat 6/16/2001 at 3:00:00 AM London thru Sat 6/16/2001 at 7:00:00 AM London Outage: EI Notes Server Maintenance Environments Impacted: EI Local/Domestic/Foreign Sites Purpose: Scheduled @ 2 week interval Backout: N/A Contact(s): David Ricafrente 713-646-7741 MARKET DATA: No Scheduled Outages. NT: SEE ORIGINAL REPORT OS/2: No Scheduled Outages. OTHER SYSTEMS: ALSO SEE ORIGINAL REPORT Impact: 172.28.10. production segment Time: Mon 6/11/2001 at 5:00:00 AM CT thru Sun 6/17/2001 at 7:00:00 AM CT Mon 6/11/2001 at 3:00:00 AM PT thru Sun 6/17/2001 at 5:00:00 AM PT Mon 6/11/2001 at 11:00:00 AM London thru Sun 6/17/2001 at 1:00:00 PM London Outage: Production Video Streaming Servers Environments Impacted: None Purpose: Backout: Contact(s): Todd Thelen 713-853-9320 Impact: CORP Time: Sat 6/16/2001 at 8:00:00 PM CT thru Sun 6/17/2001 at 9:00:00 AM CT Sat 6/16/2001 at 6:00:00 PM PT thru Sun 6/17/2001 at 7:00:00 AM PT Sun 6/17/2001 at 2:00:00 AM London thru Sun 6/17/2001 at 3:00:00 PM London Outage: Memory replacement for server madrid. Environments Impacted: sitara Purpose: Repeat memory errors on one DIMM. Backout: Reboot with bad DIMM offline. Contact(s): Malcolm Wells 713-345-3716 Impact: EBS Time: Thu 6/14/2001 at 12:00:00 PM CT thru Fri 6/22/2001 at 12:00:00 PM CT Thu 6/14/2001 at 10:00:00 AM PT thru Fri 6/22/2001 at 10:00:00 AM PT Thu 6/14/2001 at 6:00:00 PM London thru Fri 6/22/2001 at 6:00:00 PM London Outage: PPCS install at Greenspoint Environments Impacted: UNIX Users Purpose: Need PPCS servers on EIN Backout: Go back to utilizing the servers at Ardmore. Contact(s): Charlotte Ratliff 713-345-3120 Impact: CORP Time: Sat 6/16/2001 at 11:00:00 PM CT thru Sun 6/17/2001 at 12:00:00 AM CT Sat 6/16/2001 at 9:00:00 PM PT thru Sat 6/16/2001 at 10:00:00 PM PT Sun 6/17/2001 at 5:00:00 AM London thru Sun 6/17/2001 at 6:00:00 AM London Outage: User Volume Maintenence Environments Impacted: Corp Purpose: There are a number of files showing up corrupt on the volume and the messages in Event Viewer say to run CHKDSK on the volume. Backout: Will run a backup before running chkdsk. Contact(s): Frank Coles (713)406-0470 SITARA: SEE ORIGINAL REPORT CANCELLED SUN/OSS SYSTEM: No Scheduled Outages. TELEPHONY: No Scheduled Outages TERMINAL SERVER: No Scheduled Outages. UNIFY: No Scheduled Outages. ------------------------------------------------------------------------------ ----------------------------------------------- FOR ASSISTANCE (713) 853-1411 Enron Resolution Center Specific Help: Information Risk Management (713) 853-5536 SAP/ISC (713) 345-4727 Unify On-Call (713) 284-3757 [Pager] Sitara On-Call (713) 288-0101 [Pager] RUS/GOPS/GeoTools/APRS (713) 639-9726 [Pager] OSS/UA4/TARP (713) 285-3165 [Pager] CPR (713) 284-4175 [Pager] EDI Support (713) 327-3893 [Pager] EES Help Desk (713)853-9797 OR (888)853-9797 TDS -Trader Decision Support On-Call (713) 327-6032 [Pager]