Message-ID: <24952588.1075855576111.JavaMail.evans@thyme> Date: Sun, 6 Aug 2000 19:35:00 -0700 (PDT) From: juan.hernandez@enron.com To: wayne.herndon@enron.com, wayne.herndon@enron.com Subject: Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Juan Hernandez X-To: Wayne Herndon, Wayne Herndon X-cc: X-bcc: X-Folder: \Juan_Hernandez_Jun2001\Notes Folders\All documents X-Origin: Hernandez-J X-FileName: jhernan3.nsf SERC- For Saturday we sold 200MW (HE15-19 for a 5 hour take) @ $80.00. SCEG and DUKE were bidding in the mid 40's. Due to TLR's power from the North could not flow to SERC. Off-peak bids for Saturday were in the low teens. SOCO was an $11 bid for off-peak. Everyone else in SERC was flat or a low teen bid. For Sunday SOCO was a $26 bid during the afternoon peak. SCEG was a $34 bid. TLR's prevented any deals getting done with SCEG during the afternoon. DUKE, SCEG and SOSO will be on the bid for Monday. FRCC- For Saturday we sold power to Florida in the morning but were cut due to TLR's starting HE11. Bids in Florida got to as high as mid 60's. FPL and FPC were the one's bidding in the mid 60's. TLR's were not lifted until H/E 1, for H/E 1 we sold FPL $22(100mw's) into JEA. For Sunday FP&L and TALL were both on the BID @ $26-35 Hourly in the morning and BOD @ $ 55-65.00. Sunday morning we began buying power from CE and selling it to FPL and TALL. TLR's were called startng H/E 11. Florida was bidding in the mid 40's for a 16-hour schedule for Monday. Offpeak bids were in the mid teens for both Saturday and Sunday night. ERCOT- For Saturday bids were in the low to mid 30's. Offers were in the high 40's(CSW and HLP) to mid 50's(TU). We sold the City of GARLAND $54 for he 23 and 24. Their bid was high due to trans. contraints from the south to north. They had bought power from San Antonio and Reliant which ended up being cut. We ended up buying from CSW(wtu-$48) thinking this was north enough. The ISO killed the deal. They told us that as of Friday WTU will not be allowed to send out any power when south to north transmission is set to -0-. For Sunday bids were in the 30's again. Reliant and TU told us they will be bidding for HE 14-21. We purchased trans. into ERCOT for these hours.