Message-ID: <9301112.1075860880831.JavaMail.evans@thyme> Date: Thu, 10 May 2001 13:40:34 -0700 (PDT) From: mansoor.abdmoulaie@enron.com To: kevin.hyatt@enron.com Subject: Cost Estimate for MAOP facility requirements Cc: morgan.gottsponer@enron.com, eric.faucheaux@enron.com Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit Bcc: morgan.gottsponer@enron.com, eric.faucheaux@enron.com X-From: Abdmoulaie, Mansoor X-To: Hyatt, Kevin X-cc: Gottsponer, Morgan , Faucheaux, Eric X-bcc: X-Folder: \Kevin_Hyatt_Mar2002\Hyatt, Kevin\Projects X-Origin: Hyatt-K X-FileName: khyatt (Non-Privileged).pst Kevin I have completed the following costs for the MAOP facility requirements project but have not completed yet the cost of 55,90 and 115 mmcf/d alternatives on the San Juan Lateral. Presently Working with Engineering on this project. Mansoor ---------------------- Forwarded by Mansoor Abdmoulaie/ET&S/Enron on 05/10/2001 03:36 PM --------------------------- Mansoor Abdmoulaie 05/09/2001 03:32 PM To: Morgan Gottsponer/ET&S/Enron cc: Eric Faucheaux/ET&S/Enron@Enron, Perry Frazier/ET&S/Enron@ENRON, Earl Chanley/ET&S/Enron@ENRON Subject: Cost Estimate for MAOP facility requirements Level-A Cost Estimate Cost to replace 30" mainline valve assy with blowdowns and asso piping: $210,000.0 *Gas lost is not included in the cost if blow down required. Cost to do a 30" stopple project: $100,000.0 *By-pass is not required for stoppling activities. *One stopple fitting only. *Gas loss not included in the cost if blow down required. Cost/ mile to replace 30" pipe that would meet class- 3 requirements: $1,166,000 to $1,475,000 (loop with existing).