Message-ID: <6911037.1075861771125.JavaMail.evans@thyme> Date: Thu, 8 Nov 2001 10:09:54 -0800 (PST) From: kevin.hyatt@enron.com To: ron.matthews@enron.com Subject: RE: Sun Devil delivery pressure Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Hyatt, Kevin X-To: Matthews, Ron X-cc: X-bcc: X-Folder: \KHYATT (Non-Privileged)\Hyatt, Kevin\Sent Items X-Origin: Hyatt-K X-FileName: KHYATT (Non-Privileged).pst What would be the pressure if we don't install stations 1.5 and Kingman? My thinking is we might not have enough market at Cal Border to require those stations. -----Original Message----- From: Matthews, Ron Sent: Thursday, November 08, 2001 8:12 AM To: Hyatt, Kevin; Asante, Ben Subject: RE: Sun Devil delivery pressure Kevin, That is the scenario where we installed all 36" pipe and added two new stations (Station #1.5 & Kingman). The pressure to Panda will be greater than 600 psig. The lateral is off the discharge of Station #1.5 which keeps the pressure profile up. Looking at a minimum of 750 psig with and upside of 900 psig. Hope this helps. Ron Matthews -----Original Message----- From: Hyatt, Kevin Sent: Wednesday, November 07, 2001 4:21 PM To: Matthews, Ron; Asante, Ben Cc: Junus, David; Gadd, Eric Subject: Sun Devil delivery pressure Ron, can you please verify for me the delivery pressure in pounds for volume off the Sun Devil project at the juncture of Panda's lateral at the El Paso interconnect outside of Phoenix? Using Doug's cost scope from 9/28/01, are we at 600# or something different? This was the scope with the 36-inch Phoenix lateral. thanks kh