Message-ID: <29112207.1075840794199.JavaMail.evans@thyme> Date: Wed, 26 Dec 2001 13:42:06 -0800 (PST) From: j.kaminski@enron.com To: vkaminski@aol.com Subject: FW: ALLIANCE FERC ALERT: Status Report on Interconnection Agreement and Procedures & Extension Request Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Kaminski, Vince J X-To: 'vkaminski@aol.com' X-cc: X-bcc: X-Folder: \vkamins\Sent Items X-Origin: KAMINSKI-V X-FileName: vincent kaminski 1-30-02.pst -----Original Message----- From: bounce-alliance_info-90961@listserver.eei.org@ENRON On Behalf Of "The Alliance of Energy Suppliers" Sent: Tuesday, December 18, 2001 3:51 PM To: Alliance Information Subject: ALLIANCE FERC ALERT: Status Report on Interconnection Agreement and Procedures & Extension Request Attached is the status report and motion for extension of time filed on Friday, December 14 by the Generator Interconnection Coalition drafting committee. This group is the smaller subset of the larger industry-wide plenary group formed as a result of the FERC's directive to convene an Interconnection conference to develop a consensus Interconnection Agreement and Procedures document that all of industry would adopt. As the industry plenary session yielded as much results as could be expected in a large group setting, the drafting committees were formed of Generators, Transmission Owners, Transmission Dependent Utilities, and ISO/RTOs. A committee was formed for both the drafting of the Interconnection Agreement and Procedures documents. Many of your companies are represented on one of these committees. Because the FERC set a December 14 filing due date for a final consensus interconnection document, we filed for an extension of time to complete the drafting process and finalize the documents for FERC consideration. No one entity has endorsed the document in its entirety, because drafting and negotiations are still underway. Since the larger plenary had not had an opportunity to review the documents and be provided a walk-through by the drafters, the request for an extension until January 11, 2002 for which to file a final comprehensive consensus Interconnection document was made. In addition, we filed for extension of the ANOPR comments due date which was initially set for December 21, but has been extended until January 25. This will allow for the larger plenary group to reconvene the week of January 14 at FERC for a two-day session to discuss the final workproduct. A notice designating the dates and times of this plenary session will be provided at a later date. Anticipating our filing of the status report and motion for extension, FERC granted both requests for extensions to file. Attached are the status report, motions and notice granting extension. If you have an questions, please do not hesitate to contact us at alliance@eei.org or (202) 508-5098 Tonja Wicks Manager, Energy Supply Policy Alliance of Energy Suppliers Edison Electric Institute Phone: (202) 508-5098 Fax: (202) 508-5600 Fax: (202) 508-5445 - Interconnection Status Report.pdf - Notice granting extension.pdf - Alliance of Energy Suppliers.vcf