Message-ID: <19123637.1075851523437.JavaMail.evans@thyme> Date: Fri, 26 Oct 2001 14:45:53 -0700 (PDT) From: no.address@enron.com Subject: Supplemental Weekend Outage Report for 10-26-01 through 10-28-01 Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Enron Change Management Announcement@ENRON X-To: Houston Outage Report@ENRON X-cc: X-bcc: X-Folder: \ALEWIS (Non-Privileged)\Deleted Items X-Origin: LEWIS-A X-FileName: ALEWIS (Non-Privileged).pst ------------------------------------------------------------------------------------------------------ W E E K E N D S Y S T E M S A V A I L A B I L I T Y F O R October 26, 2001 5:00pm through October 29, 2001 12:00am ------------------------------------------------------------------------------------------------------ 3 ALLEN CENTER POWER OUTAGE: Time: Sat 10/27/2001 at 4:00:00 PM CT thru Sat 10/27/2001 at 8:00:00 PM CT Sat 10/27/2001 at 2:00:00 PM PT thru Sat 10/27/2001 at 6:00:00 PM PT Sat 10/27/2001 at 10:00:00 PM London thru Sun 10/28/2001 at 2:00:00 AM London From 4:00 - 8:00 p.m., Trizechan Properties has scheduled a shutdown of all electrical service at 3 Allen Center. Enron Network Services will power down the 3AC network infrastructure between 3:30-4:00. There will be no 3 Allen Center network access during the electrical maintenance and the outage will continue until ENS is able to power up all of the networking devices. All 3AC and 2AC employees will have no telephone or voicemail service during outage period. When power is restored to building, systems will be powered back up and telco services tested for dial tone and connectivity. If you need access to 3AC anytime that Saturday, you will need to contact Trizechan Properties beforehand with your security information (Jael Olson at 713-336-2300). Anyone who attempts to enter the building on Saturday that is not on the list will be denied access. SCHEDULED SYSTEM OUTAGES: ARDMORE DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages. AZURIX: No Scheduled Outages. EB34 DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages. EDI SERVER: SEE ORIGINAL REPORT EES: Impact: EES Time: Fri 10/26/2001 at 7:00:00 PM CT thru Fri 10/26/2001 at 7:30:00 PM CT Fri 10/26/2001 at 5:00:00 PM PT thru Fri 10/26/2001 at 5:30:00 PM PT Sat 10/27/2001 at 1:00:00 AM London thru Sat 10/27/2001 at 1:30:00 AM London Outage: Upgrade IOS On Chicago Router Environments Impacted: EES Purpose: Voice Tie Lines not working correctly. Backout: Load a different IOS. Contact(s): Garhett Clark 713-345-9953 Impact: EES POSTPONED Time: Sat 10/27/2001 at 6:00:00 PM CT thru Sun 10/28/2001 at 12:00:00 AM CT Sat 10/27/2001 at 4:00:00 PM PT thru Sat 10/27/2001 at 10:00:00 PM PT Sun 10/28/2001 at 12:00:00 AM London thru Sun 10/28/2001 at 6:00:00 AM London Outage: Migrate EESHOU-FS1to SAN Environments Impacted: EES Purpose: New Cluster server is on SAN and SAN backups This will provide better performance, server redundancy, and backups should complete without problems. Backout: Take new server offline, Bring up old servers change users profiles back to original settings. Contact(s): Roderic H Gerlach 713-345-3077 EI: ALSO SEE ORIGINAL REPORT Impact: EI Time: Sat 10/27/2001 at 2:00:00 PM CT thru Sat 10/27/2001 at 8:30:00 PM CT Sat 10/27/2001 at 12:00:00 PM PT thru Sat 10/27/2001 at 6:30:00 PM PT Sat 10/27/2001 at 8:00:00 PM London thru Sun 10/287/2001 at 2:30:00 AM London Outage: Moving ei-dns01 and ei-dns02 from 3AC 17th floor to 35th floor. Environments Impacted: DNS Purpose: We are losing the space on 17th floor in 3AC. We are moving during the building power outage so that we take the server down only once. Backout: None, we have to move before Nov.1. Contact(s): Malcolm Wells 713-345-3716 ENRON CENTER SOUTH DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages ENRON NORTH AMERICAN LANS: Impact: Corp Time: Sat 10/27/2001 at 12:00:00 AM CT thru Sat 10/27/2001 at 6:00:00 AM CT Fri 10/26/2001 at 10:00:00 PM PT thru Sat 10/27/2001 at 4:00:00 AM PT Sat 10/27/2001 at 6:00:00 AM London thru Sat 10/27/2001 at 12:00:00 PM London Outage: AT@T Cable & Wireless Environments Impacted: Houston T1 to Quebec Purpose: Backout: Contact(s): Brandy Brumbaugh 800-486-9999 Impact: CORP Time: Fri 10/26/2001 at 6:00:00 PM CT thru Fri 10/26/2001 at 6:15:00 PM CT Fri 10/26/2001 at 4:00:00 PM PT thru Fri 10/26/2001 at 4:15:00 PM PT Sat 10/27/2001 at 12:00:00 AM London thru Sat 10/27/2001 at 12:15:00 AM London Outage: Nortel VPN cable run Environments Impacted: Corp Purpose: To change VPN routing from 3AC to ECN Backout: pull cables. Contact(s): Chrissy Grove 713-345-8269 Vince Fox 713-853-5337 Impact: CORP Time: Fri 10/26/2001 at 10:30:00 PM CT thru Fri 10/26/2001 at 11:00:00 PM CT Fri 10/26/2001 at 8:30:00 PM PT thru Fri 10/26/2001 at 9:00:00 PM PT Sat 10/27/2001 at 4:30:00 AM London thru Sat 10/27/2001 at 5:00:00 AM London Outage: Nortel VPN router change Environments Impacted: Corp Purpose: To migrate out of 3AC to avoid power outage this weekend. Backout: Turn routing to 3AC back on. Contact(s): Chrissy Grove 713-345-8269 Vince Fox 713-853-5337 FIELD SERVICES: No Scheduled Outages. INTERNET: No Scheduled Outages. MESSAGING: No Scheduled Outages. MARKET DATA: No Scheduled Outages. NT: No Scheduled Outages. OS/2: No Scheduled Outages. OTHER SYSTEMS: SEE ORIGINAL REPORT SITARA: No Scheduled Outages. SUN/OSS SYSTEM: No Scheduled Outages. TELEPHONY: SEE ORIGINAL REPORT TERMINAL SERVER: No Scheduled Outages. UNIFY: No Scheduled Outages. ---------------------------------------------------------------------------------------------------------------------------- FOR ASSISTANCE (713) 853-1411 Enron Resolution Center Specific Help: Information Risk Management (713) 853-5536 SAP/ISC (713) 345-4727 Unify On-Call (713) 284-3757 [Pager] Sitara On-Call (713) 288-0101 [Pager] RUS/GOPS/GeoTools/APRS (713) 639-9726 [Pager] OSS/UA4/TARP (713) 285-3165 [Pager] CPR (713) 284-4175 [Pager] EDI Support (713) 327-3893 [Pager] EES Help Desk (713)853-9797 OR (888)853-9797 TDS -Trader Decision Support On-Call (713) 327-6032 [Pager]