Message-ID: <3005317.1075855675001.JavaMail.evans@thyme> Date: Thu, 13 Jul 2000 03:24:00 -0700 (PDT) From: phillip.allen@enron.com To: keith.holst@enron.com Subject: Project Elvis and Cactus Open Gas Position Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Phillip K Allen X-To: Keith Holst X-cc: X-bcc: X-Folder: \Phillip_Allen_Dec2000\Notes Folders\Discussion threads X-Origin: Allen-P X-FileName: pallen.nsf ---------------------- Forwarded by Phillip K Allen/HOU/ECT on 07/13/2000 10:24 AM --------------------------- From: Andy Chen on 07/12/2000 02:14 PM To: Michael Etringer/HOU/ECT@ECT cc: Frank W Vickers/HOU/ECT@ECT, Saji John/HOU/ECT@ECT, Phillip K Allen/HOU/ECT@ECT, John Arnold/HOU/ECT@ECT Subject: Project Elvis and Cactus Open Gas Position Mike-- Here are the net open Socal border positions we have for Elvis and Cactus. Let's try and set up a conference call with Phillip and John to talk about their offers at the back-end of their curves. Roughly speaking, we are looking at a nominal 3750 MMBtu/d for 14 years from May 2010 on Elvis, and 3000 MMBtu/d on Cactus fromJune 2004 to April 2022. Andy