Message-ID: <32707892.1075851880954.JavaMail.evans@thyme> Date: Tue, 20 Jun 2000 05:34:00 -0700 (PDT) From: larry.campbell@enron.com To: leo.nichols@enron.com Subject: Weekly Environmental Activity Report-Roswell Area Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Larry Campbell X-To: Leo Nichols X-cc: X-bcc: X-Folder: \Larry_Campbell_Nov2001_1\Notes Folders\All documents X-Origin: CAMPBELL-L X-FileName: lcampbe.nsf A meeting was held in Laughlin, Nv with PG&E to discuss the liquids which were received and analytical result of 505 ppm which occurred at the PG&E F/S. Additional discussions centered around the latest migration of PCB's into the PG&E system and control technologies to stop additional migration of PCB's into PCB free portions of their distribution system. Annual emission fees were paid to the ADEQ for C/S No. 1, Kingman in the amount of $31,145.26 Annual hazardous waste fees were paid to the DTSC for the facilities that operate in the state California A meeting was held in Albuquerque to discuss and apprise involved parties of histoirc and proposed activities for 2000 for the 10 groundwater remediation projects currently being conducted in Texas and New Mexico. Received a call from the TNRCC about an air quality inspection at the Irion Co. No. 1 C/S on 6/30. the team was notified and preparations are currently being completed to ensure that all recordkeeping, permits and monitoring reports are onsite during the inspection.