Message-ID: <24729181.1075851906033.JavaMail.evans@thyme> Date: Mon, 24 Sep 2001 01:03:00 -0700 (PDT) From: kohn.roger@epamail.epa.gov To: larry.campbell@enron.com Subject: Re: Draft Permit Conditions for Transition Period Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Kohn.Roger@epamail.epa.gov X-To: Larry.Campbell@enron.com X-cc: X-bcc: X-Folder: \Larry_Campbell_Nov2001_1\Notes Folders\Discussion threads X-Origin: CAMPBELL-L X-FileName: lcampbe.nsf Larry, Glad the conditions work for you. Those are the only conditions I had any question about. We never share entire draft permits before public notice. Occasionally, if there is a question about a specific issue, we'll share one or two conditions. That's what happened here. Larry.Campbell @enron.com To: Roger Kohn/R9/USEPA/US@EPA cc: Arnold.L.Eisenstein@enron.com, William.Kendrick@enron.com, 09/24/2001 John.Shafer@enron.com 07:36 AM Subject: Re: Draft Permit Conditions for Transition Period Roger, these conditions will work out just fine for the generators. I have passed them on to our project director and he has given them the thumbs up. I really appreciate you giving me the opportunity to comment on the conditions. Id like to have a peek at the other conditions in the permit as you develop them, just to expidite the issuance. Thanks for working with us on this..... Kohn.Roger@epamail.epa.gov on 09/20/2001 02:52:05 PM To: lcampbe@enron.com cc: Subject: Draft Permit Conditions for Transition Period Hi Larry, Per our conversation today, I want to make sure I understand your intent for the transition periods for Klagetoh and Leupp. Below are two conditions from the draft Klagetoh permit. We would use the same approach for Leupp. Please let me know whether we have understood your intent correctly. Note that there will also be some associated recordkeeping requirements. Roger Kohn U.S. EPA Region 9 75 Hawthorne St., Mail Code AIR-3 San Francisco, CA 94105 phone: (415) 744-1238 fax: (415) 744-1076 * * * * * * * * * From the draft Klagetoh permit: The following conditions apply during the transition period. The transition period is defined as the six month period that starts on the first day that Emission Unit 404 (GE gas turbine) or Emission Units 423 or 424 (Catepillar generator engines) operates. 1. During the transition period, Emission Units 401, 402, and 403 (Clark compressor engines) shall not operate simultaneously with Emission Unit 404 (GE gas turbine). [40 CFR 71.6(a)(13)(iii), 71.6(b), 71.7(e)(1)(i)(A)(4)(i)] 2. During the transition period, either Emission Unit 421 or 422 (Waukesha generator engines) may operate simultaneously with either Emission Unit 423 or 424 (Catepillar generator engines). Under no circumstances may Emission Unit 421 operate simultaneously with Emission Unit 422, nor may Emission Unit 423 operate simultaneously with Emission Unit 424. [40 CFR 71.6(a)(13)(iii), 71.6(b), 71.7(e)(1)(i)(A)(4)(i)] ********************************************************************** This e-mail is the property of Enron Corp. and/or its relevant affiliate and may contain confidential and privileged material for the sole use of the intended recipient (s). Any review, use, distribution or disclosure by others is strictly prohibited. If you are not the intended recipient (or authorized to receive for the recipient), please contact the sender or reply to Enron Corp. at enron.messaging.administration@enron.com and delete all copies of the message. This e-mail (and any attachments hereto) are not intended to be an offer (or an acceptance) and do not create or evidence a binding and enforceable contract between Enron Corp. (or any of its affiliates) and the intended recipient or any other party, and may not be relied on by anyone as the basis of a contract by estoppel or otherwise. Thank you. **********************************************************************