Message-ID: <11426936.1075851908190.JavaMail.evans@thyme> Date: Wed, 9 May 2001 04:25:00 -0700 (PDT) From: larry.campbell@enron.com To: randy.belyeu@enron.com, joe.richards@enron.com Subject: Koch South Texas pipeline data room questions and answers Mime-Version: 1.0 Content-Type: text/plain; charset=ANSI_X3.4-1968 Content-Transfer-Encoding: quoted-printable X-From: Larry Campbell X-To: Randy Belyeu, Joe Richards X-cc: X-bcc: X-Folder: \Larry_Campbell_Nov2001_1\Notes Folders\Eott due diligence X-Origin: CAMPBELL-L X-FileName: lcampbe.nsf Randy, based upon the records review, this is the only issue that may be a= =20 problem. If a tank has been moved to another location, it would trigger=20 requirements which were enacted on the date of the relocation. For instanc= e,=20 if a tank constructed prior to 1973 was moved in 1978, there would be=20 emissions control requirements placed on the tank as required by the 1978= =20 tank regulations. If the tank had remained at its original location, it=20 would be grandfathered with respect to emissions. However, because the tan= k=20 was relocated, it is looked upon as being a tank constructed in 1978 and=20 subject to the 1978 regulations and is no longer grandfathered. I was not given this information during the records review, so I dont know = if=20 any of the tanks apply. If any of the tanks fit into the above scenerio,= =20 EOTT or Koch will be looking at some major $$$$$ to bring any subject tank= =20 into compliance. Generally speaking, the regualtions and costs to comply= =20 increase as a function of date. =20 1. Q. Of the tanks listed on the spreadsheet, have any of the tanks been=20 relocated from its original construction locations? List the tank, date=20 moved and location moved to. A. Benevides Station Tank 6125 and Mirando Station Tank 28591 were relocat= ed=20 to those stations. Three Rivers Tanks 28508 and 28100 were relocated and= =20 re-erected at that station. Duval Station Tank 28052 and Mirando Station= =20 28045 were relocated and re-erected at those stations prior to Koch=01,s= =20 acquisition of those assets. ---------------------- Forwarded by Larry Campbell/ET&S/Enron on 05/09/2001= =20 10:03 AM --------------------------- Jim Coen @ EOTT 05/08/2001 10:27 AM To: Joe Richards/Houston/Eott@Eott, Randy Belyeu/OTS/Enron@ENRON, Larry=20 Campbell/ET&S/Enron@Enron, Warren Fusilier/Remote/Eott@Eott, Jeremy=20 Dawson/Houston/Eott@Eott cc: =20 Subject: Koch South Texas pipeline data room questions and answers ----- Forwarded by Jim Coen/Houston/Eott on 05/08/2001 10:51 AM ----- =09"Lofing, Michael" =0905/08/2001 09:48 AM =09=09=20 =09=09 To: Jim Coen/Houston/Eott@Eott =09=09 cc:=20 =09=09 Subject: Koch South Texas pipeline data room questions and answers Jim Attached are the Koch South Texas Pipeline data room questions with answers attached. I have also attached data provided to other bidders. If you hav= e any additional questions, please contact me, 828-4027. Regards, Mike <> <> <> - EOTT Questions and Answers_.doc - over-short labor utilities.xls - CrudeVehicles.xls