Subject: Weekend Outage Report for 7-6-01 through 7-9-01
Mime-Version: 1.0
Content-Type: text/plain; charset=us-ascii
Content-Transfer-Encoding: 7bit
X-From: Enron Announcements
X-To: Houston Outage Report
X-cc: 
X-bcc: 
X-Folder: \Mary_Hain_Aug2000_Jul2001\Notes Folders\All documents
X-Origin: Hain-M
X-FileName: mary-hain.nsf

------------------------------------------------------------------------------
------------------------
W E E K E N D   S Y S T E M S   A V A I L A B I L I T Y

F O R

July 6, 2001 5:00pm through July 9, 2001 12:00am
------------------------------------------------------------------------------
------------------------



ECS to ECN Network Interconnection July 14, 2001

This is a notification that the Enron Corp. I/T Networks team will be 
connecting the new building network infrastructure located in Enron Center 
South (ECS) to the existing Enron Center North (ECN) backbone network.  While 
this activity is not expected to produce a disruption to network services, 
this notice is designed to alert the organization to our activities.  No 
network hardware or systems are anticipated to be shutdown.  The actual 
physical interconnection of the networks will be performed in the EB 34th 
floor Data Center.

Interconnection activities are scheduled to occur the evening of July 14, 
2001 starting from 7:00 p.m.(CT) and completing around 11:00 p.m. (CT). 
Application testing activities will begin at 11:00 p.m. (CT) once all network 
testing has completed.

If you have any further questions, please contact Pete Castrejana at 
713-410-0642 for more information.

                            
SCHEDULED SYSTEM OUTAGES: 

ARDMORE DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages.

AZURIX: No Scheduled Outages.

EB34 DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages.

EDI SERVER: No Scheduled Outages.

ENRON CENTER SOUTH DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages

ENRON NORTH AMERICAN LANS:  
Impact:  CORP
Time:  Fri 7/6/2001 at  7:00:00 PM CT thru Fri 7/6/2001 at  9:00:00 PM CT
 Fri 7/6/2001 at  5:00:00 PM PT thru Fri 7/6/2001 at  7:00:00 PM PT
 Sat 7/7/2001 at  1:00:00 AM London thru Sat 7/7/2001 at  3:00:00 AM London
Outage:  Put NACAL-CLUSTER1 into production
Environments Impacted:  Corp Calgary
Purpose: Current server (ECTCAL-FS1) running out of disk space
Backout: Turn on ECTCAL-FS01
Contact(s):  Greg Hibbert    
                                        
Impact:  CORP
Time:  Fri 7/6/2001 at  5:00:00 PM CT thru Fri 7/6/2001 at  9:00:00 PM CT
 Fri 7/6/2001 at  3:00:00 PM PT thru Fri 7/6/2001 at  7:00:00 PM PT
 Fri 7/6/2001 at  11:00:00 PM London thru Sat 7/7/2001 at  3:00:00 AM London
Outage:  Calgary Network Upgrade
Environments Impacted:  Corp Calgary
Purpose: Processors in existing Cisico 3810 routers are maxed out causing 
sessions to freeze on Terminal Server and updates from CQG.
Backout: Put old Cisco 3810 back into production.
Contact(s):  Brad K Martin  (403) 974-6922  (403)212-9280
  Todd Bowen  (403) 974-6951  
  Greg Hibbert  (403) 974-6785  
 
FIELD SERVICES:  No Scheduled Outages.

INTERNET: 
Impact:  CORP
Time:  Fri 7/6/2001 at  5:15:00 PM CT thru Fri 7/6/2001 at  5:45:00 PM CT
 Fri 7/6/2001 at  3:15:00 PM PT thru Fri 7/6/2001 at  3:45:00 PM PT
 Fri 7/6/2001 at  11:15:00 PM London thru Fri 7/6/2001 at  11:45:00 PM London
Outage:  Install Bypass Firewalls for EOL
Environments Impacted:  Corp
Purpose: Firewalls needed to ease the load on the Local Directors
Backout: Remove Bypass Firewalls
Contact(s):  James Hill    713-345-2551

Impact:  CORP
Time:  Fri 7/6/2001 at  6:00:00 PM CT thru Fri 7/6/2001 at  11:00:00 PM CT
 Fri 7/6/2001 at  4:00:00 PM PT thru Fri 7/6/2001 at    9:00:00 PM PT
 Sat 7/7/2001 at 12:00:00 AM London thru Sat 7/7/2001 at  5:00:00 AM London
Outage:  EOL Terminal Server Relocation Phase II
Environments Impacted:  EOL
Purpose: Servers are blowing hot air and causing thermal problems on other 
units.  Server need to be relocated to a environment with redundant network 
capabilities.  Space is needed for UNIX/Network equipment.
Backout: Leave servers online where they are at
Contact(s):  Todd Thelen          713-853-9320
  Andrew Hawthorn  713-853-6069  877-345-0586
  Guy Schlein            713-853-6865
  Kevin Hopper         713-853-7989

MESSAGING: No Scheduled Outages.

MARKET DATA: No Scheduled Outages.

NT: No Scheduled Outages.

OS/2:  No Scheduled Outages.

OTHER SYSTEMS: 
Impact:  CORP
Time:  Sat 7/7/2001 at   2:00:00 AM CT thru Sun 7/8/2001 at  6:00:00 PM CT
 Sat 7/7/2001 at 12:00:00 AM PT thru Sun 7/8/2001 at 4:00:00 PM PT
 Sat 7/7/2001 at  8:00:00 AM London thru Mon 7/9/2001 at  12:00:00 AM London
Outage:  Upgrade RMSPROD
Environments Impacted:  ENA
Purpose: Take advantage of new features for better performance and to 
accommodate larger data volume and usage.
Backout: The only way to back out is a complete refresh from backup. This 
process will take 6.5 - 7.5 Hours to complete if required
Contact(s):  Emmett Cleveland    713-853-3873
 
SITARA:  No Scheduled Outages.

SUN/OSS SYSTEM: No Scheduled Outages.

TELEPHONY: No Scheduled Outages

TERMINAL SERVER:  No Scheduled Outages.

UNIFY:  No Scheduled Outages.

------------------------------------------------------------------------------
-------------------------------------------------------
        FOR ASSISTANCE

(713) 853-1411   Enron Resolution Center


Specific Help:
Information Risk Management   (713) 853-5536
SAP/ISC                                                                       
        (713) 345-4727
Unify On-Call      (713) 284-3757  [Pager]
Sitara On-Call     (713) 288-0101  [Pager]
RUS/GOPS/GeoTools/APRS   (713) 639-9726  [Pager]
OSS/UA4/TARP    (713) 285-3165  [Pager]
CPR      (713) 284-4175  [Pager]
EDI Support      (713) 327-3893  [Pager]
EES Help Desk     (713)853-9797 OR (888)853-9797
TDS -Trader Decision Support On-Call                    (713) 327-6032 [Pager]