Message-ID: <20184172.1075860431490.JavaMail.evans@thyme> Date: Thu, 5 Jul 2001 09:46:00 -0700 (PDT) From: enron.announcements@enron.com To: houston.report@enron.com Subject: Weekend Outage Report for 7-6-01 through 7-9-01 Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Enron Announcements X-To: Houston Outage Report X-cc: X-bcc: X-Folder: \Mary_Hain_Aug2000_Jul2001\Notes Folders\Notes inbox X-Origin: Hain-M X-FileName: mary-hain.nsf ------------------------------------------------------------------------------ ------------------------ W E E K E N D S Y S T E M S A V A I L A B I L I T Y F O R July 6, 2001 5:00pm through July 9, 2001 12:00am ------------------------------------------------------------------------------ ------------------------ ECS to ECN Network Interconnection July 14, 2001 This is a notification that the Enron Corp. I/T Networks team will be connecting the new building network infrastructure located in Enron Center South (ECS) to the existing Enron Center North (ECN) backbone network. While this activity is not expected to produce a disruption to network services, this notice is designed to alert the organization to our activities. No network hardware or systems are anticipated to be shutdown. The actual physical interconnection of the networks will be performed in the EB 34th floor Data Center. Interconnection activities are scheduled to occur the evening of July 14, 2001 starting from 7:00 p.m.(CT) and completing around 11:00 p.m. (CT). Application testing activities will begin at 11:00 p.m. (CT) once all network testing has completed. If you have any further questions, please contact Pete Castrejana at 713-410-0642 for more information. SCHEDULED SYSTEM OUTAGES: ARDMORE DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages. AZURIX: No Scheduled Outages. EB34 DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages. EDI SERVER: No Scheduled Outages. ENRON CENTER SOUTH DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages ENRON NORTH AMERICAN LANS: Impact: CORP Time: Fri 7/6/2001 at 7:00:00 PM CT thru Fri 7/6/2001 at 9:00:00 PM CT Fri 7/6/2001 at 5:00:00 PM PT thru Fri 7/6/2001 at 7:00:00 PM PT Sat 7/7/2001 at 1:00:00 AM London thru Sat 7/7/2001 at 3:00:00 AM London Outage: Put NACAL-CLUSTER1 into production Environments Impacted: Corp Calgary Purpose: Current server (ECTCAL-FS1) running out of disk space Backout: Turn on ECTCAL-FS01 Contact(s): Greg Hibbert Impact: CORP Time: Fri 7/6/2001 at 5:00:00 PM CT thru Fri 7/6/2001 at 9:00:00 PM CT Fri 7/6/2001 at 3:00:00 PM PT thru Fri 7/6/2001 at 7:00:00 PM PT Fri 7/6/2001 at 11:00:00 PM London thru Sat 7/7/2001 at 3:00:00 AM London Outage: Calgary Network Upgrade Environments Impacted: Corp Calgary Purpose: Processors in existing Cisico 3810 routers are maxed out causing sessions to freeze on Terminal Server and updates from CQG. Backout: Put old Cisco 3810 back into production. Contact(s): Brad K Martin (403) 974-6922 (403)212-9280 Todd Bowen (403) 974-6951 Greg Hibbert (403) 974-6785 FIELD SERVICES: No Scheduled Outages. INTERNET: Impact: CORP Time: Fri 7/6/2001 at 5:15:00 PM CT thru Fri 7/6/2001 at 5:45:00 PM CT Fri 7/6/2001 at 3:15:00 PM PT thru Fri 7/6/2001 at 3:45:00 PM PT Fri 7/6/2001 at 11:15:00 PM London thru Fri 7/6/2001 at 11:45:00 PM London Outage: Install Bypass Firewalls for EOL Environments Impacted: Corp Purpose: Firewalls needed to ease the load on the Local Directors Backout: Remove Bypass Firewalls Contact(s): James Hill 713-345-2551 Impact: CORP Time: Fri 7/6/2001 at 6:00:00 PM CT thru Fri 7/6/2001 at 11:00:00 PM CT Fri 7/6/2001 at 4:00:00 PM PT thru Fri 7/6/2001 at 9:00:00 PM PT Sat 7/7/2001 at 12:00:00 AM London thru Sat 7/7/2001 at 5:00:00 AM London Outage: EOL Terminal Server Relocation Phase II Environments Impacted: EOL Purpose: Servers are blowing hot air and causing thermal problems on other units. Server need to be relocated to a environment with redundant network capabilities. Space is needed for UNIX/Network equipment. Backout: Leave servers online where they are at Contact(s): Todd Thelen 713-853-9320 Andrew Hawthorn 713-853-6069 877-345-0586 Guy Schlein 713-853-6865 Kevin Hopper 713-853-7989 MESSAGING: No Scheduled Outages. MARKET DATA: No Scheduled Outages. NT: No Scheduled Outages. OS/2: No Scheduled Outages. OTHER SYSTEMS: Impact: CORP Time: Sat 7/7/2001 at 2:00:00 AM CT thru Sun 7/8/2001 at 6:00:00 PM CT Sat 7/7/2001 at 12:00:00 AM PT thru Sun 7/8/2001 at 4:00:00 PM PT Sat 7/7/2001 at 8:00:00 AM London thru Mon 7/9/2001 at 12:00:00 AM London Outage: Upgrade RMSPROD Environments Impacted: ENA Purpose: Take advantage of new features for better performance and to accommodate larger data volume and usage. Backout: The only way to back out is a complete refresh from backup. This process will take 6.5 - 7.5 Hours to complete if required Contact(s): Emmett Cleveland 713-853-3873 SITARA: No Scheduled Outages. SUN/OSS SYSTEM: No Scheduled Outages. TELEPHONY: No Scheduled Outages TERMINAL SERVER: No Scheduled Outages. UNIFY: No Scheduled Outages. ------------------------------------------------------------------------------ ------------------------------------------------------- FOR ASSISTANCE (713) 853-1411 Enron Resolution Center Specific Help: Information Risk Management (713) 853-5536 SAP/ISC (713) 345-4727 Unify On-Call (713) 284-3757 [Pager] Sitara On-Call (713) 288-0101 [Pager] RUS/GOPS/GeoTools/APRS (713) 639-9726 [Pager] OSS/UA4/TARP (713) 285-3165 [Pager] CPR (713) 284-4175 [Pager] EDI Support (713) 327-3893 [Pager] EES Help Desk (713)853-9797 OR (888)853-9797 TDS -Trader Decision Support On-Call (713) 327-6032 [Pager]