Message-ID: <9301112.1075860880831.JavaMail.evans@thyme>
Date: Thu, 10 May 2001 13:40:34 -0700 (PDT)
From: mansoor.abdmoulaie@enron.com
To: kevin.hyatt@enron.com
Subject: Cost Estimate for MAOP facility requirements
Cc: morgan.gottsponer@enron.com, eric.faucheaux@enron.com
Mime-Version: 1.0
Content-Type: text/plain; charset=us-ascii
Content-Transfer-Encoding: 7bit
Bcc: morgan.gottsponer@enron.com, eric.faucheaux@enron.com
X-From: Abdmoulaie, Mansoor </O=ENRON/OU=NA/CN=RECIPIENTS/CN=NOTESADDR/CN=41680A35-823F91BA-862566E1-503199>
X-To: Hyatt, Kevin </O=ENRON/OU=NA/CN=RECIPIENTS/CN=KHYATT>
X-cc: Gottsponer, Morgan </O=ENRON/OU=NA/CN=RECIPIENTS/CN=MGOTTSP>, Faucheaux, Eric </O=ENRON/OU=NA/CN=RECIPIENTS/CN=NOTESADDR/CN=3F938E41-7B726B5-86256895-769151>
X-bcc: 
X-Folder: \Kevin_Hyatt_Mar2002\Hyatt, Kevin\Projects
X-Origin: Hyatt-K
X-FileName: khyatt (Non-Privileged).pst

Kevin
  I have completed the following costs for the MAOP facility requirements project but have not completed yet the cost of 55,90 and 115 mmcf/d alternatives on
 the San Juan Lateral. Presently Working with Engineering on this project.
 Mansoor


---------------------- Forwarded by Mansoor Abdmoulaie/ET&S/Enron on 05/10/2001 03:36 PM ---------------------------


Mansoor Abdmoulaie
05/09/2001 03:32 PM
To:	Morgan Gottsponer/ET&S/Enron
cc:	Eric Faucheaux/ET&S/Enron@Enron, Perry Frazier/ET&S/Enron@ENRON, Earl Chanley/ET&S/Enron@ENRON 

Subject:	Cost Estimate for MAOP facility requirements

 			
		Level-A Cost Estimate


	Cost to replace 30" mainline valve assy with blowdowns and asso piping:
	$210,000.0
*Gas lost is not included in the cost if blow down required.


	Cost to do a 30" stopple project:
	$100,000.0
	*By-pass is not required for stoppling activities.
	*One stopple fitting only.
	*Gas loss not included in the cost if blow down required.

	Cost/ mile to replace 30" pipe that would meet class- 3 requirements: 
	$1,166,000 to $1,475,000 (loop with existing).

	

	
	
	
	 