Message-ID: <9088119.1075860884078.JavaMail.evans@thyme>
Date: Wed, 3 Oct 2001 09:10:31 -0700 (PDT)
From: ron.matthews@enron.com
To: r..keller@enron.com, d..martin@enron.com, doug.cebryk@enron.com, 
	l..eisenstein@enron.com, dennis.alters@enron.com, 
	morgan.gottsponer@enron.com, kevin.hyatt@enron.com, 
	eric.gadd@enron.com, l..smith@enron.com
Subject: Sun Devil Cost Reconciliation
Mime-Version: 1.0
Content-Type: text/plain; charset=us-ascii
Content-Transfer-Encoding: 7bit
X-From: Matthews, Ron </O=ENRON/OU=NA/CN=RECIPIENTS/CN=RMATTHE>
X-To: Keller, John R. </O=ENRON/OU=NA/CN=RECIPIENTS/CN=Jkeller3>, Martin, Jerry D. </O=ENRON/OU=NA/CN=RECIPIENTS/CN=Jmartin>, Cebryk, Doug </O=ENRON/OU=NA/CN=RECIPIENTS/CN=Dcebryk>, Eisenstein, Arnold L. </O=ENRON/OU=NA/CN=RECIPIENTS/CN=Aeisens>, Alters, Dennis </O=ENRON/OU=NA/CN=RECIPIENTS/CN=Dalters>, Gottsponer, Morgan </O=ENRON/OU=NA/CN=RECIPIENTS/CN=Mgottsp>, Hyatt, Kevin </O=ENRON/OU=NA/CN=RECIPIENTS/CN=Khyatt>, Gadd, Eric </O=ENRON/OU=NA/CN=RECIPIENTS/CN=Egadd>, Smith, Mike L. </O=ENRON/OU=NA/CN=RECIPIENTS/CN=Msmith14>
X-cc: 
X-bcc: 
X-Folder: \Kevin_Hyatt_Mar2002\Hyatt, Kevin\Projects\Sun Devil
X-Origin: Hyatt-K
X-FileName: khyatt (Non-Privileged).pst

Attached is a Powerpoint slide showing the differences between the Planning's Level and Engineering's Level A+.  Planning's Level A was update to include the current project scope uncovered through Engineering's investigation of the pipeline route and compressor stations.  Planning's estimated costs based on current facilities is around 21% of the Level A+ costs.  Normalizing the Level A brings the costs within 2% of the Engineering Level A+ estimate.


 