Message-ID: <3127619.1075857678338.JavaMail.evans@thyme> Date: Fri, 8 Jun 2001 14:57:25 -0700 (PDT) From: no.address@enron.com Subject: SUPPLEMENTAL Weekend Outage Report for 6-8-01 through 6-11-01 Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Enron Change Management Announcement@ENRON X-To: ouston Outage Report@ENRON X-cc: X-bcc: X-Folder: \jlavora\Deleted Items X-Origin: Lavorado-J X-FileName: jlavora.pst ------------------------------------------------------------------------------------------------------ W E E K E N D S Y S T E M S A V A I L A B I L I T Y F O R June 8, 2001 5:00pm through June 11, 2001 12:00am ------------------------------------------------------------------------------------------------------ ECS to ECN Network Interconnection, June 9th 2001 POSTPONED This is a notification that the Enron Corp. I/T Networks team will be connecting the new building network infrastructure located in Enron Center South (ECS) to the existing Enron Center North (ECN) backbone network. While this activity is not expected to produce a disruption to network services, this notice is designed to alert the organization to our activities. No network hardware or systems are anticipated to be shutdown. The actual physical interconnection of the networks will be performed in the EB 34th floor Data Center. Interconnection activities are scheduled to occur the evening of June 9th 2001 starting from 7:00 p.m.(CT) and completing around 11:00 p.m. (CT). Application testing activities will begin at 11:00 p.m. (CT) once all network testing has completed. If you have any further questions, please contact Pete Castrejana at 713-410-0642 for more information. SCHEDULED SYSTEM OUTAGES: ARDMORE DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages. AZURIX: No Scheduled Outages. EB34 DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages. EDI SERVER: No Scheduled Outages. ENRON CENTER SOUTH DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages ENRON NORTH AMERICAN LANS: Impact: ENS Time: Fri 6/8/2001 at 10:30:00 PM CT thru Fri 6/8/2001 at 11:30:00 PM CT Fri 6/8/2001 at 8:30:00 PM PT thru Fri 6/8/2001 at 9:30:00 PM PT Sat 6/9/2001 at 4:30:00 AM London thru Sat 6/9/2001 at 5:30:00 AM London Outage: Upgrade code on Ardmore routers Environments Impacted: Ardmore Purpose: There is a bug with the version of code that we are using that causes the switches to crash. Backout: Contact(s): Scott Shishido 713-853-9780 Impact: CORP Time: Fri 6/8/2001 at 5:30:00 PM CT thru Fri 6/8/2001 at 8:30:00 PM CT Fri 6/8/2001 at 3:30:00 PM PT thru Fri 6/8/2001 at 6:30:00 PM PT Fri 6/8/2001 at 11:30:00 PM London thru Sat 6/9/2001 at 2:30:00 AM London Outage: Split VLAN 468 into a /27 network Environments Impacted: Corp Purpose: Separate the load and traffic between AEXT, AEIN, & AX environments Backout: Contact(s): Morgan Gothard 713-345-7387 Impact: CORP Time: Fri 6/8/2001 at 5:30:00 PM CT thru Fri 6/8/2001 at 6:30:00 PM CT Fri 6/8/2001 at 3:30:00 PM PT thru Fri 6/8/2001 at 4:30:00 PM PT Fri 6/8/2001 at 11:30:00 PM London thru Sat 6/9/2001 at 12:30:00 AM London Outage: AEINFW swap Environments Impacted: Corp Purpose: Eminent growth and related stability issues. Backout: Reinstall original units Contact(s): Morgan Gothard 713-345-7387 FIELD SERVICES: No Scheduled Outages. INTERNET: No Scheduled Outages. MESSAGING: Impact: Exchange Time: Sat 6/9/2001 at 12:00:00 PM CT thru Sat 6/9/2001 at 2:00:00 PM CT Sat 6/9/2001 at 10:00:00 AM PT thru Sat 6/9/2001 at 12:00:00 PM PT Sat 6/9/2001 at 6:00:00 PM London thru Sat 6/9/2001 at 8:00:00 PM London Outage: Apply latest hotfixes to Nahou-msmbx03v & Nahou-msmbx05v Environments Impacted: Exchange Users on Nahou-msmbx03v & 05v Purpose: Ensure backups and data integrity Backout: Uninstall Hotfixes Contact(s): Scott Albright 713-345-9381 Tim Hudson 713-853-9289 MARKET DATA: Impact: CORP Time: Fri 6/8/2001 at 5:00:00 PM CT thru Fri 6/8/2001 at 7:00:00 PM CT Fri 6/8/2001 at 3:00:00 PM PT thru Fri 6/8/2001 at 5:00:00 PM PT Fri 6/8/2001 at 11:00:00 PM London thru Sat 6/9/2001 at 1:00:00 AM London Outage: Market Data TV systems upgrades Environments Impacted: Trading Floors Purpose: Increase system reliability and systems management, also allow presentation of new infrastructure content to the trading floor plasma screens Backout: re-install original systems Contact(s): John Sieckman 713-345-7862 NT: No Scheduled Outages. OS/2: No Scheduled Outages. OTHER SYSTEMS: ALSO SEE ORIGINAL REPORT Impact: CORP Time: Fri 6/8/2001 at 7:30:00 PM CT thru Fri 6/8/2001 at 9:30:00 PM CT Fri 6/8/2001 at 5:30:00 PM PT thru Fri 6/8/2001 at 7:30:00 PM PT Sat 6/9/2001 at 1:30:00 AM London thru Sat 6/9/2001 at 3:30:00 AM London Outage: NAMEX-LN1 and NAMTY-LN1- Needs Rebooting Environments Impacted: Local Office Purpose: Need to reload NETIQ Agents for NAMTY-LN1 and NAMEX-LN1 Backout: Contact(s): Wilma Bleshman 713-853-1562 Impact: Time: Sat 6/9/2001 at 10:00:00 PM CT thru Sun 6/10/2001 at 1:30:00 AM CT Sat 6/9/2001 at 8:00:00 PM PT thru Sat 6/9/2001 at 11:30:00 PM PT Sun 6/10/2001 at 4:00:00 AM London thru Sun 6/10/2001 at 7:30:00 AM London Outage: Upgrade for E10K SSP tremor requires downtime on server moe. Environments Impacted: Global Purpose: An SSP is the controlling server for an E10K platform. Moe is a domain on the E10K platform named aftershock. In order to complete the upgrade of moe, we must first upgrade the SSP. The first phase will entail upgrading the SSP to Solaris 8 and the SSP software. Backout: The SSP is really a new server that needs to be configured. The old SSP will be there if we need to back out. Contact(s): Malcolm Wells 713-345-3716 SITARA: No Scheduled Outages. SUN/OSS SYSTEM: No Scheduled Outages. TELEPHONY: SEE ORIGINAL REPORT TERMINAL SERVER: No Scheduled Outages. UNIFY: SEE ORIGINAL REPORT ------------------------------------------------------------------------------------------------------------------------------------- FOR ASSISTANCE (713) 853-1411 Enron Resolution Center Specific Help: Information Risk Management (713) 853-5536 SAP/ISC (713) 345-4727 Unify On-Call (713) 284-3757 [Pager] Sitara On-Call (713) 288-0101 [Pager] RUS/GOPS/GeoTools/APRS (713) 639-9726 [Pager] OSS/UA4/TARP (713) 285-3165 [Pager] CPR (713) 284-4175 [Pager] EDI Support (713) 327-3893 [Pager] EES Help Desk (713)853-9797 OR (888)853-9797 TDS -Trader Decision Support On-Call (713) 327-6032 [Pager]