Message-ID: <5789047.1075844135724.JavaMail.evans@thyme> Date: Wed, 20 Dec 2000 07:57:00 -0800 (PST) From: perry.frazier@enron.com To: michelle.lokay@enron.com Subject: POGO interconnect Lea County New Mexico. Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Perry Frazier X-To: Michelle Lokay X-cc: X-bcc: X-Folder: \Michelle_Lokay_Dec2000_June2001_2\Notes Folders\All documents X-Origin: LOKAY-M X-FileName: mlokay.nsf fyi ---------------------- Forwarded by Perry Frazier/ET&S/Enron on 12/20/2000 03:58 PM --------------------------- Perry Frazier 12/11/2000 03:14 PM To: Christine Stokes/ET&S/Enron@Enron cc: Earl Chanley/ET&S/Enron@Enron Subject: POGO interconnect Lea County New Mexico. Christine: POGO has requested a new interconnect with TW in Sec. 18, T22S, R32E of Lea County New Mexico. There is a 4" on 24" existing tap at station # 612+14 between Mile Post 11 & 12 south of WT-I, indentified by the local operations team. The cost estimate below contains the usual and customary facility and equipment costs: Chromatograph $55,000 H2O Monitor $10,000 H2S Monitor $35,000 EFM $35,000 Flow control $34,000 Positive shut-in $22,000 Flow bypass $12,000 Engi. CSUP, Contig. $120,000 Subtotal $323,000 Tax Gross-up $100,000 Total $423,000 These cost are identical to the EOG +/- 10% numbers from the E&C Team. Once again, the turn around time is generally 90 days from work order generation to in-service reporting. The equipment best case delivery is 45 days with about a 5 day turn around time in construction. Let me know if you have any questions or need further assistance. 3-0667