Message-ID: <21081508.1075860968236.JavaMail.evans@thyme> Date: Thu, 21 Feb 2002 09:30:23 -0800 (PST) From: mansoor.abdmoulaie@enron.com To: michelle.lokay@enron.com Subject: TW/ Lonestar Ward County intercoonect-----Level-A cost Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Abdmoulaie, Mansoor X-To: Lokay, Michelle X-cc: X-bcc: X-Folder: \Michelle_Lokay_Mar2002\Lokay, Michelle\Inbox X-Origin: Lokay-M X-FileName: mlokay (Non-Privileged).pst Michelle In order to make this interconnect bi-directional the following work need to be performed: ( capacity 35- 60 mmcf/d at 800-850 # pressure) 1): Blowdown gas in 5.335 miles of 12" ( gas-loss) at 1000# pressure 2): Remove a flapper in the check-valve or turn around the existing check-valve The cost for this is approximately $8,000 to $10,000. Still waiting for Earl Chanley from Roswell to send me some facility information regarding the Pecos interconnect. Mansoor