Message-ID: <4649046.1075845886039.JavaMail.evans@thyme> Date: Thu, 14 Sep 2000 09:49:00 -0700 (PDT) From: brian.barto@enron.com To: darrell.stovall@enron.com, peter.nassab@enron.com, larry.bishop@enron.com Subject: Sample GE/WestLB/7FA Contract Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Brian D Barto X-To: Darrell Stovall, Peter Nassab, Larry Bishop X-cc: X-bcc: X-Folder: \Kay_Mann_June2001_2\Notes Folders\General stuff X-Origin: MANN-K X-FileName: kmann.nsf Darrell: Per your request, for further requirements of ENA, attached is the most recent off balance sheet (West LB) turbine purchase contract executed between EECC and GE. Although it includes guarantees for a steam turbine also, this language can be easily removed. There are currently a handfull of provisions that both EECC and ENA legal, commercial and technical representatives are negotiating achieve broad based acceptability under the guidance of Sheila Tweed, that GE and Enron both will insist be incorporated into the future agreements. The majority of the provisions in this contract will require little or no modification for use in the purchase of a gas turbine for a U.S. based project. The portion of the executed contract that is not attached, and is arguably the most important, is the equipment specification. Although a fairly standardized, abridged specification, the detailed project specific requirements are provide the level of clarity that is essential to understanding the scope to be supplied and integral to the guaranteed performance required in the Contract. This docuement is currently drafted in WordPerfect, but is to be issued in Word going forward. If you have questions or require assistance, please let me know.