Message-ID: <31294522.1075845896803.JavaMail.evans@thyme> Date: Thu, 7 Jun 2001 09:54:00 -0700 (PDT) From: enron.announcements@enron.com To: houston.report@enron.com Subject: Weekend Outage Report for 6-8-01 through 6-11-01 Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Enron Announcements X-To: Houston Outage Report X-cc: X-bcc: X-Folder: \Kay_Mann_June2001_3\Notes Folders\Notes inbox X-Origin: MANN-K X-FileName: kmann.nsf ------------------------------------------------------------------------------ ------------------------ W E E K E N D S Y S T E M S A V A I L A B I L I T Y F O R June 8, 2001 5:00pm through June 11, 2001 12:00am ------------------------------------------------------------------------------ ------------------------ ECS to ECN Network Interconnection, June 9th 2001 POSTPONED This is a notification that the Enron Corp. I/T Networks team will be connecting the new building network infrastructure located in Enron Center South (ECS) to the existing Enron Center North (ECN) backbone network. While this activity is not expected to produce a disruption to network services, this notice is designed to alert the organization to our activities. No network hardware or systems are anticipated to be shutdown. The actual physical interconnection of the networks will be performed in the EB 34th floor Data Center. Interconnection activities are scheduled to occur the evening of June 9th 2001 starting from 7:00 p.m.(CT) and completing around 11:00 p.m. (CT). Application testing activities will begin at 11:00 p.m. (CT) once all network testing has completed. If you have any further questions, please contact Pete Castrejana at 713-410-0642 for more information. SCHEDULED SYSTEM OUTAGES: ARDMORE DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages. AZURIX: No Scheduled Outages. EB34 DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages. EDI SERVER: No Scheduled Outages. ENRON CENTER SOUTH DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages ENRON NORTH AMERICAN LANS: No Scheduled Outages. FIELD SERVICES: No Scheduled Outages. INTERNET: No Scheduled Outages. MESSAGING: No Scheduled Outages. MARKET DATA: No Scheduled Outages. NT: No Scheduled Outages. OS/2: No Scheduled Outages. OTHER SYSTEMS: Impact: pdx-ad-03.ebs.enron.net [DS] Site: Portland Time: Sat 6/9/2001 at 9:00:00 PM CT thru Sat 6/9/2001 at 9:15:00 PM CT Sat 6/9/2001 at 7:00:00 PM PT thru Sat 6/9/2001 at 7:15:00 PM PT Sun 6/10/2001 at 3:00:00 AM London thru Sun 6/10/2001 at 3:15:00 PM London Outage: Increase EBS domain account password complexity Environments Impacted: EBS (enron_comm) users Purpose: Increasing password complexity reduces the security risk for the CORP domain and corp security based applications. Backout: Deinstall the password filter. Contact(s): Marlin Gubser 713-853-4281 Impact: CORP Time: Sat 6/9/2001 at 10:00:00 PM CT thru Sun 6/10/2001 at 1:00:00 AM CT Sat 6/9/2001 at 8:00:00 PM PT thru Sat 6/9/2001 at 11:00:00 PM PT Sun 6/10/2001 at 4:00:00 AM London thru Sun 6/10/2001 at 7:00:00 AM London Outage: Memory upgrade and storage relocation for server fracture. Environments Impacted: RMS global company OFS Purpose: Add memory for performance improvement. Permanently rack D1000 disk array. Backout: Restore to original configuration without memory. Contact(s): Malcolm Wells 713-345-3716 SITARA: No Scheduled Outages. SUN/OSS SYSTEM: No Scheduled Outages. TELEPHONY: Impact: CORP Time: Fri 6/8/2001 at 5:00:00 PM Calgary thru Sun 6/10/2001 at 12:00:00 PM Calgary Fri 6/8/2001 at 6:00:00 PM CT thru Sun 6/10/2001 at 1:00:00 PM CT Fri 6/8/2001 at 4:00:00 PM PT thru Sun 6/10/2001 at 11:00:00 AM PT Sat 6/9/2001 at 12:00:00 AM London thru Sun 6/10/2001 at 7:00:00 PM London Outage: Enron Canada-Calgary PBX Upgrade Environments Impacted: Corp Calgary Purpose: To bring Enron Calgary up to Enron standards. Allow 4 digit dialing between Enron Canada Corp. and Enron Direct Limited Partnership, and network the voicemail. Enron Calgary will be without phone service for the duration of the upgrade. Backout: As a complete new cabinet "A" will be installed we will have the old cabinet with processor on site that can be reinstalled in the event that problems arise. Contact(s): Brad K Martin (403) 974-6922 (403) 212-9280 TERMINAL SERVER: No Scheduled Outages. UNIFY: Impact: CORP Time: Fri 6/8/2001 at 2:00:00 PM CT thru Mon 6/11/2001 at 2:00:00 AM CT Fri 6/8/2001 at 12:00:00 PM PT thru Mon 6/11/2001 at 12:00:00 AM PT Fri 6/8/2001 at 8:00:00 PM London thru Mon 6/11/2001 at 8:00:00 AM London Outage: Unify Gas Migration from Sybase to SQL Server Environments Impacted: Unify Users Purpose: Increase reliability and scalability of Unify system Backout: Reinstate Sybase version if insurmountable problems occur during the conversion weekend. Contact(s): Brian Ripley 713-345-4709 Matt Pena 713-345-4209 Ramesh Rao 713-349-4207 Bob Ward 713-345-4409 ------------------------------------------------------------------------------ ------------------------------------------------------- FOR ASSISTANCE (713) 853-1411 Enron Resolution Center Specific Help: Information Risk Management (713) 853-5536 SAP/ISC (713) 345-4727 Unify On-Call (713) 284-3757 [Pager] Sitara On-Call (713) 288-0101 [Pager] RUS/GOPS/GeoTools/APRS (713) 639-9726 [Pager] OSS/UA4/TARP (713) 285-3165 [Pager] CPR (713) 284-4175 [Pager] EDI Support (713) 327-3893 [Pager] EES Help Desk (713)853-9797 OR (888)853-9797 TDS -Trader Decision Support On-Call (713) 327-6032 [Pager]