Message-ID: <11298798.1075841281861.JavaMail.evans@thyme> Date: Fri, 20 Apr 2001 08:34:00 -0700 (PDT) From: stacy.runswick@enron.com To: portland.shift@enron.com Subject: We are shorrt @ PV LLH for 2/21/01 Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Stacy Runswick X-To: Portland Shift X-cc: X-bcc: X-Folder: \steven merriss 6-28-02\Notes Folders\Notes inbox X-Origin: MERRISS-S X-FileName: steven merriss 6-28-02.nsf The original schedule was 50 MW's TEP GEN @PV(EPE XCHANGE) - EPMI - SRP-MIRANT-CISO(T)PVD/SP15. Mirant was cut by the CISO 25 mw HE 1-6, 8 mw HE 23, and 25 mw HE 24. Please refer to Mirant tag #3316 for this revised schedule. Mirant owes us a sink for 25mw HE 1-6, 8mw HE 23, and 25mw HE 24 and has decided to provide the sink on a real-time basis. Please check with Mirant to assure they have a sink for these hours. Please check out with TEP when you are aware of the new sink. Thanks Stacy