Message-ID: <18535146.1075842677348.JavaMail.evans@thyme> Date: Mon, 24 Apr 2000 06:29:00 -0700 (PDT) From: gerald.nemec@enron.com To: eric.gillaspie@enron.com Subject: Interconnect Agreement Mime-Version: 1.0 Content-Type: text/plain; charset=ANSI_X3.4-1968 Content-Transfer-Encoding: quoted-printable X-From: Gerald Nemec X-To: Eric Gillaspie X-cc: X-bcc: X-Folder: \Gerald_Nemec_Dec2000_June2001_1\Notes Folders\Sent X-Origin: NEMEC-G X-FileName: gnemec.nsf ---------------------- Forwarded by Gerald Nemec/HOU/ECT on 04/24/2000 01:2= 9=20 PM --------------------------- Robert D Morgan 04/18/2000 12:12 PM To: Gerald Nemec/HOU/ECT@ECT cc: Brian M Riley/HOU/ECT@ECT=20 Subject: Interconnect Agreement In the short-term, I need two agreements: 1) A delivery point from LRC to SkyGen Energy LLC at the Cosmar plant in= =20 Ascension Parish, La. Bridgeline Holdings will install, own, and operate= =20 5369' of 8" and the 100MM/D measurement station. Next week would be okay. 2) A bi-directional point between HPL and Tejas. The details are still bei= ng=20 negotiated. If possible, I would like it Wedesday EOB. Item Install Own Operate 11mile of 16 Header Tejas Tejas Tejas 12 on 30 Hot Tap for Texoma HPL HPL HPL 1600=01, of 16 between Texoma and M&R Tejas HPL HPL Check Measurement (Flow Computer, SCADA) Tejas Tejas Tejas OPP to protect HPL Tejas HPL HPL Custody Measurement Tejas HPL HPL Flow/Pressure Control Tejas HPL HPL Over-Ride Control Tejas Tejas Tejas Easement for Hot Tap Tejas HPL HPL ROW for 1600' Tejas HPL HPL Easement for Measurement Tejas HPL HPL