Message-ID: <10187104.1075841422885.JavaMail.evans@thyme> Date: Mon, 27 Aug 2001 15:31:41 -0700 (PDT) From: kalmeida@caiso.com To: 20participants@caiso.com Subject: CAISO Notification: Demand Relief Program Settlement Charge Types Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Almeida, Keoni X-To: ISO Market Participants X-cc: X-bcc: X-Folder: \ExMerge - Platter, Phillip\Inbox X-Origin: PLATTER-P X-FileName: phillip platter 6-26-02.PST This is a reminder that the Summer 2001 ISO Demand Relief Program charges are reflected on the June 30 statements and June invoices. As announced previously this year, the ISO has developed a Summer 2001 Demand Relief Program (DRP). The program is designed to provide an additional level of demand reduction on the ISO system that can be implemented during a stage 2 Emergency in an effort to prevent involuntary load curtailments or rotating blackouts associated with a Stage 3 Emergency. Similar to last years program, the same charge types are utilized for capacity, Charge Type 7 and 117, described in the first link below. Two new Charge Types, 3472 and 3482, have been created for the energy payment and allocation when contracted loads are called upon to curtail, described in the second link below. Although the program was initiated in June, no calls were made to curtail load, therefore, charges 3472 and 3482 were not utilized. The periods in which the Demand Relief Program was called upon to initiate interruptions of contracted loads can be found at the third link below. Charge Types 7 and 117 Description: http://www.caiso.com/docs/09003a6080/10/6d/09003a6080106d20.pdf Charge Types 3472 and 3482 Description: http://www.caiso.com/docs/09003a6080/10/6d/09003a6080106d21.pdf 2001 DRP Load Curtailments: http://www.caiso.com/docs/09003a6080/10/6d/09003a6080106d23.pdf Keoni Almeida California Independent System Operator