Message-ID: <394365.1075841413683.JavaMail.evans@thyme> Date: Fri, 1 Feb 2002 11:32:28 -0800 (PST) From: frank.billington@oatiinc.com To: phillip.platter@enron.com Subject: !!! OATI Etag 1.7 Minimum Requirements !!! Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: frank.billington@oatiinc.com X-To: Platter, Phillip X-cc: X-bcc: X-Folder: \ExMerge - Platter, Phillip\Inbox X-Origin: PLATTER-P X-FileName: phillip platter 6-26-02.PST Time is running very short. Is your company prepared for Etag 1.7? These are the minimum REQUIRED steps that must be completed prior to March 6, 2002: --------------------------- (1) All entities must update the NERC Registry at http://www.tsin.com. (1a) CA's and TP's must designate PORs and PODs that are valid on tags. (1b) PSE's must designate associated scheduling PORs and PODs. See http://www.tsin.com or inquire with NERC for details. --------------------------- (2) All OATI Users must have functioning OATI Digital Certificates. (2a) Without the certificate you cannot access Etag 1.7 after March 6, 2002 at all. (2b) Inquire internally to determine if a supervisor has already contacted us. (3b) To begin the process of acquiring OATI Digital Certificates, please complete this document and send it to OATI: http://www.oaticerts.com/repository/Company_Information.doc --------------------------- Failure to complete these steps will result in a partial or complete lack of tagging access and capability! For additional information on these and other critical Etagging issues, please visit OATI's Etag 1.7 Information Page at http://www.oatiinc.com/etag17. Frank Billington OATI Manager of Customer Services