Message-ID: <20785513.1075857239113.JavaMail.evans@thyme> Date: Thu, 20 Apr 2000 06:14:00 -0700 (PDT) From: benjamin.rogers@enron.com To: mike.coleman@enron.com Subject: cipco Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Benjamin Rogers X-To: Mike Coleman X-cc: X-bcc: X-Folder: \Benjamin_Rogers_Dec2000_3\Notes Folders\Sent X-Origin: Rogers-B X-FileName: brogers.nsf ---------------------- Forwarded by Benjamin Rogers/HOU/ECT on 04/20/2000 01:13 PM --------------------------- Oscar Dalton 04/20/2000 11:44 AM To: Benjamin Rogers/HOU/ECT@ECT cc: Subject: cipco Ben My thoughts on the Central Iowa Power Cooperative RFP Let me know what you think 1. We will develop two GE 7 EA's. Unit 1 operational 5/1/01. Unit 2 operational 5/1/02 2. We will use the Ogden/Boone County Site being secured by John Moore. The site is 1/4 mile from Northern Natural Gas Mainline. Also, Ameren 345 Kv and Alliant 115Kv line onsite. Assume interconnects to both of these systems. Please break out cost for each. 3. Assume no fuel oil back-up 4. Assume no black start 5. Design the units to be later converted to combined cycle. 6. Assume water injection for nox control. 7. Assume portable de-min water facilities 8. Assume Enron does EPC 9. Assume CIPCO will finance and own the plant through ther term of the PSA and thereafter 10. Assume CIPCO will execute a power sales agreement (PSA) with Enron from 5/1/01 through 10/31/07