Message-ID: <29641679.1075857818401.JavaMail.evans@thyme> Date: Wed, 10 May 2000 02:36:00 -0700 (PDT) From: dale.neuner@enron.com To: kevin.ruscitti@enron.com Subject: ANR ML 7 Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Dale Neuner X-To: Kevin Ruscitti X-cc: X-bcc: X-Folder: \Kevin_Ruscitti_Dec2000\Notes Folders\Discussion threads X-Origin: Ruscitti-K X-FileName: kruscit.nsf Look at the below; do you think this is what your looking for? ---------------------- Forwarded by Dale Neuner/HOU/ECT on 05/10/2000 09:35 AM --------------------------- From: Melba Lozano on 05/09/2000 04:07 PM To: David Forster/Corp/Enron@Enron cc: Dale Neuner/HOU/ECT@ECT Subject: EPNG Blanco NonBondad David, Could you take a few minutes to review the attached new location EPNG NonBondad. Tori Kuykendall from the west desk has told us she wants the same language that SoCal Topock has due to the fact that the EPNG NonBondad section of the pipeline has a history of breaking down and being interrupted all the time. Thank you, Melba 58986 Existing: EPNG SoCal Topock The transaction is for delivery at the Southern California Gas Company - Topock interconnect with El Paso Natural Gas. The volumes scheduled to be delivered are subject to reductions due to normal operational constraints on both El Paso Natural Gas and Southern California Gas Company pipelines based upon historical operating conditions. The reductions caused by these constraints are excused nonperformance and are not considered a failure to receive or deliver firm gas. New: EPNG Blanco NonBondad The transaction is for delivery at El Paso San Juan Blanco non-Bondad. The volumes scheduled to be delivered are subject to reductions due to normal operational constraints on El Paso Natural Gas Pipelines based upon historical operating conditions. The reductions caused by these constraints are excused nonperformance and are not considered a failure to receive or deliver firm gas.