Message-ID: <32668210.1075860734910.JavaMail.evans@thyme> Date: Fri, 18 Jan 2002 10:02:42 -0800 (PST) From: steve.coash@enron.com To: controllers.dl-ets@enron.com, steve.thomas@enron.com Subject: Weekend Storage Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Coash, Steve X-To: DL-ETS Gas Controllers , Thomas, Steve X-cc: X-bcc: X-Folder: \Darrell_Schoolcraft_Mar2002\Schoolcraft, Darrell\Deleted Items X-Origin: Schoolcraft-D X-FileName: dschool (Non-Privileged).pst Cunningham: Max. Withdrawals - 525 freeflow and 600 with horsepower. Max. Injections - 400 with 6 units. Redfield: Max. Withdrawal 375, Min. withdrawwal 250. Average target w/d 300 to 320. Possible 72 hour shut in on some wells for well testing through the weekend depending on system requirements, Redfield should check with Gas Control before starting. Lyons: 57 withdrawal. Lyons getting increased H2O production at this time, should eventually get back up to 70 M2 withdrawal once water problems are corrected. Garner: Max. withdrawal - 300. Done liquifying for the heating season due to refrig. compressor being unavailable. Wrenshall: Max. withdrawal - 300. 18 M2 liquifaction.