Message-ID: <26471751.1075860748240.JavaMail.evans@thyme> Date: Thu, 13 Dec 2001 07:56:55 -0800 (PST) From: rfranson@czn.com To: darrell.schoolcraft@enron.com Subject: FW: preliminary report Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: "Franson, Rob" @ENRON X-To: Schoolcraft, Darrell X-cc: X-bcc: X-Folder: \Darrell_Schoolcraft_Mar2002\Schoolcraft, Darrell\Inbox X-Origin: Schoolcraft-D X-FileName: dschool (Non-Privileged).pst Attached is a copy of the preliminary report that recommends that the inlet pressure to Citizens "Griffith Plant" Station be limited to 740 psig. Note that this is only a preliminary report that Citizens is reviewing. Some of our "reviewers" are on vacation, and have held up the process of getting this report finalized. Since I was temporarily assigned to another position during the time that gas was introduced to this line, I have asked my employee Martin Conboy to create a log of events on how these stations had been operated. I will send it to you later today. Can you have David Roensch review to see if anything is missing. I feel that it is a good idea to document the different operation modes with results prior to agreeing on any further changes. -----Original Message----- From: Ray Kelm - Kelm Engineering [mailto:ray@kelm-engr.com] Sent: Wednesday, November 28, 2001 3:22 PM To: Robert Franson - Citizens Subject: preliminary report Robert, I had to delete a couple figures to get the size below 1 meg to email. Call if you have questions. Ray - CZN102301mod.doc