Message-ID: <6966157.1075860748581.JavaMail.evans@thyme> Date: Thu, 14 Feb 2002 11:15:50 -0800 (PST) From: darrell.schoolcraft@enron.com To: dl-etsgascontrollers@enron.com Subject: FW: Smartpig Results Sta's 8-7 & Sta's 7-6 Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Schoolcraft, Darrell X-To: DL-ETS Gas Controllers X-cc: X-bcc: X-Folder: \Darrell_Schoolcraft_Mar2002\Schoolcraft, Darrell\Inbox X-Origin: Schoolcraft-D X-FileName: dschool (Non-Privileged).pst We will need to watch pressures very close and manage horsepower so we do not exceed the 939#. We need to set alarm limits. Will keep you updated. DS -----Original Message----- From: Brown, Max Sent: Thursday, February 14, 2002 10:59 AM To: Schoolcraft, Darrell; January, Steve Cc: Pribble, Dan; Nelson, Mike; Whippo, Jeff; Johnson, David L.; Crump, Michael; Ames, Mike; Moseman, Merlin; Bailey, Arnie; Gormley, John; Chanley, Earl; Kunkel, Laura; Smith, Rick Subject: Smartpig Results Sta's 8-7 & Sta's 7-6 The decision has been made based on the latest smartpig results that the operating pressure for the pipeline section from Station 8 to Station 6 is not to exceed 939 psi until the actual status of the pipeline can be evaluated based upon the smartpig information and any necessary repairs can be made. Additionally, a conference call for Friday (2-15) at 2:PM CST has been established to initiate discussions regarding excavations and possible repairs that may be needed. Conference number is 877-795-3687 Code 724709. Everyone plz try to participate in this call if at all possible. Max Brown