Message-ID: <28406988.1075845294608.JavaMail.evans@thyme> Date: Thu, 22 Mar 2001 18:07:00 -0800 (PST) From: jim.schwieger@enron.com To: jim.schwieger@enron.com Subject: Estimation of Potential KVSR fuel expense Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Jim Schwieger X-To: Jim Schwieger X-cc: X-bcc: X-Folder: \Schwieger, Jim\Schwieger, Jim\Sent Items X-Origin: SCHWIEGER-J X-FileName: Schwieger, Jim.pst ---------------------- Forwarded by Jim Schwieger/HOU/ECT on 03/22/2001 03:06 PM --------------------------- Jim Schwieger 09/25/2000 09:13 AM To: Brad Blevins/HOU/ECT@ECT cc: Subject: Estimation of Potential KVSR fuel expense Brad: Right now we have to assume that we will be withdrawing Nov. 2000 through March, 2001 with a goal of emptying the facility down to 60 BCF. This will require the injection of approximately 55 BCF of gas from April 1, 2001 through October 31, 2001. Available run time should be no lower than 98%. Why would it be greater? The rest will have to be answered by someone else. Swig ---------------------- Forwarded by Jim Schwieger/HOU/ECT on 09/25/2000 09:03 AM --------------------------- Enron North America Corp. From: Brad Blevins 09/22/2000 09:26 PM To: Greg Brazaitis/HOU/ECT@ECT, James McKay/HOU/ECT@ECT, Jim Schwieger/HOU/ECT@ECT, Jack Simunek/HOU/ECT@ECT, Emma Kam Welsch/HOU/ECT@ECT cc: Subject: Estimation of Potential KVSR fuel expense Hanover Compression has given me a revised fuel consumption number of 7150 BTU/horsepower-hr for the KVSRs once they have been converted to Clean Burn technology. This compares to the present 7500 BTU/horsepower-hr. We need to come to a consensus on the assumptions that will be used with this figure. These assumptions will need to be as follows: How many hours a year do we really think that these units will run? I am assuming that they will not be running if Bammel is on withdrawal. Correct or not? How much horsepower will really run? This will be determined by how much market HPL will hope to capture from ANP and possibly Equistar. It will also be affected by the suction pressure of the gas, which is, in turn, determined by how much HPL is injecting and pressures at Katy. Finally, what available run time do we want to assume here? 90%? I have no preconceived notions of what these assumptions should be; therefore, I am soliciting input from each of you. We need to be in agreement before Emma starts her work. Thank you.